会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Single point incremental forming of metallic materials using applied direct current
    • 使用直流电源单金属增量成型
    • US08021501B2
    • 2011-09-20
    • US12194355
    • 2008-08-19
    • John Roth
    • John Roth
    • B21D37/16
    • C21D7/02B21D31/005C21D1/09C21D7/13C21D9/46C21D9/48
    • A method for forming a sheet metal component using an electric current passing through the component is provided. The method can include providing a single point incremental forming, the machine operable to perform a plurality of single point incremental deformations on the sheet metal component and also apply an electric direct current to the sheet a metal component during at least part of the forming. The direct current can be applied before or after the forming has started and/or be terminated before or after the forming has stopped and can reduce the magnitude of force required to produce a given amount of deformation, increase the amount of deformation exhibited before failure and/or reduce any springback typically exhibited by the sheet metal component.
    • 提供了使用通过该部件的电流形成金属片部件的方法。 该方法可以包括提供单点递增成形,该机器可操作以在钣金部件上执行多个单点增量变形,并且还在成形的至少一部分期间向金属部件施加电直流电。 可以在成形开始之前或之后施加直流电流和/或在成形停止之后或之后终止,并且可以减小产生给定量的变形所需的力的大小,增加在故障之前展现的变形量, /或减少钣金部件通常表现的任何回弹。
    • 5. 发明申请
    • SINGLE POINT INCREMENTAL FORMING OF METALLIC MATERIALS USING APPLIED DIRECT CURRENT
    • 使用直接电流的金属材料的单点增量成形
    • US20090044590A1
    • 2009-02-19
    • US12194355
    • 2008-08-19
    • John Roth
    • John Roth
    • B21D37/16
    • C21D7/02B21D31/005C21D1/09C21D7/13C21D9/46C21D9/48
    • A method for forming a sheet metal component using an electric current passing through the component is provided. The method can include providing a single point incremental forming, the machine operable to perform a plurality of single point incremental deformations on the sheet metal component and also apply an electric direct current to the sheet a metal component during at least part of the forming. The direct current can be applied before or after the forming has started and/or be terminated before or after the forming has stopped and can reduce the magnitude of force required to produce a given amount of deformation, increase the amount of deformation exhibited before failure and/or reduce any springback typically exhibited by the sheet metal component.
    • 提供了使用通过该部件的电流形成金属片部件的方法。 该方法可以包括提供单点递增成形,该机器可操作以在钣金部件上执行多个单点增量变形,并且还在成形的至少一部分期间向金属部件施加电直流电。 可以在成形开始之前或之后施加直流电流和/或在成形停止之后或之后终止,并且可以减小产生给定量的变形所需的力的大小,增加在故障之前展现的变形量, /或减少钣金部件通常表现的任何回弹。
    • 7. 发明申请
    • BUILDING PLAN COMPLIANCE SYSTEM AND METHOD
    • 建筑计划合规体系与方法
    • US20080059220A1
    • 2008-03-06
    • US11847577
    • 2007-08-30
    • Kenneth John RothLawrence Leonard LitchfieldGurupreet Singh Bains
    • Kenneth John RothLawrence Leonard LitchfieldGurupreet Singh Bains
    • G06Q99/00
    • G06Q10/10G06Q30/018G06Q30/02G06Q50/165G06Q50/18
    • A system for performing a computerized building code compliance check with an appropriate jurisdiction is disclosed. The system enables a user to connect to a compliance utility by way of the Internet in order to upload a CAD file. When a CAD file is received, the system performs an analysis to determine whether the building plan was compiled in accordance with defined naming conventions. When a plan is determined to be of the appropriate format, the system extracts building elements from the CAD file, compares each element against a corresponding jurisdictional code, and determines whether the building plan is compliant. When the system determines that a building plan is compliant, the user is provided with a certificate of compliance. The system further analyzes building plans to provide highly targeted offers and enables vendors to bid to provide goods and services based on plan details.
    • 公开了一种用于执行与适当管辖区域的计算机化建筑规范合规性检查的系统。 该系统使用户能够通过Internet连接到合规性实用程序,以便上传CAD文件。 收到CAD文件后,系统将进行分析,以确定建筑计划是否按照定义的命名约定进行编译。 当计划被确定为适当的格式时,系统从CAD文件中提取构建元素,将每个元素与相应的管辖代码进行比较,并确定建筑计划是否符合规定。 当系统确定建筑物计划符合规定时,向用户提供合规证书。 该系统进一步分析建筑计划,以提供高度针对性的优惠,并使供应商根据计划细节投标提供商品和服务。