会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 14. 发明申请
    • LIFTING ARRANGEMENT FOR CONSTRUCTION MACHINE
    • 建筑机械起吊布置
    • WO2016123732A1
    • 2016-08-11
    • PCT/CN2015/072096
    • 2015-02-02
    • GUANGXI LIUGONG MACHINERY CO., LTD.
    • WAGNER, Edward
    • E02F3/36B65G65/04
    • E02F3/422E02F3/34E02F3/342E02F3/38E02F9/0841
    • A lifting arrangement for a construction machine comprises a main arm (3) which is provided with a pivot connector (4) at a proximate end thereof and an equipment connector (5) at a distal end thereof, a main arm support means (6) for pivotably supporting said pivot connector (4) of said main arm (3), wherein said main arm support means (6) is movable in a direction which includes at least a component in the front-rear direction with respect to said frame arrangement. Further a guiding means (7) is provided which is engaged to said main arm (3) at a guided portion (10) of said main arm (3) positioned between said pivot connector (4) and said equipment connector (5).
    • 一种用于建筑机械的升降装置包括主臂(3),其在其近端处设置有枢转连接器(4)和在其远端处的设备连接器(5),主臂支撑装置(6) 用于可枢转地支撑所述主臂(3)的所述枢转连接器(4),其中所述主臂支撑装置(6)能够在至少包括相对于所述框架装置的前后方向上的部件的方向上移动。 此外,提供了一种引导装置(7),其在位于所述枢轴连接器(4)和所述设备连接器(5)之间的所述主臂(3)的引导部分(10)处与所述主臂(3)接合。
    • 15. 发明申请
    • MACHINE CONTROL SYSTEM FOR OPERATING CONSTRUCTION MACHINE
    • WO2021016788A1
    • 2021-02-04
    • PCT/CN2019/098138
    • 2019-07-29
    • GUANGXI LIUGONG MACHINERY CO., LTD.
    • WAGNER, Edward
    • E02F9/20E02F3/96
    • Machine control system (100) for operating a construction machine (1). The machine control system (100) comprises a plurality of operating elements (110) for operating the construction machine (1) in a loader mode and in at least one excavator mode. The machine control system (100) further comprises a control device (120) that is configured to selectively set a loader control layout (L) or at least one excavator control layout (E1, E2) of the plurality of operating elements (110), wherein the loader control layout (L) comprises an assignment of the plurality of operating elements (110) with loader operating functions and the at least one excavator control layout (E1, E2) comprises an assignment of the plurality of operating elements (110) with excavator operating functions that is different to the assignment of the plurality of operating elements (110) with the loader operating functions. The machine control system (100) further comprises a switch (130) that is configured to communicate with the control device (120) for selecting one of the loader control layout (L) and the at least one excavator control layout (E1, E2). Construction machine (1) that comprises such a machine control system (100).
    • 17. 发明申请
    • LOADER WITH LIFTING ARRANGEMENT
    • WO2019144686A1
    • 2019-08-01
    • PCT/CN2018/117221
    • 2018-11-23
    • GUANGXI LIUGONG MACHINERY CO., LTD.
    • WAGNER, EdwardPLANTE, Sean
    • E02F3/28E02F3/36E02F3/42
    • A loader (1) has a frame arrangement with a front frame portion (2) and a rear frame portion (3), and an operator's cab (7) mounted to the rear frame portion (3), the operator's cab (7) having a front window (13) with a lower boundary (43), and a lifting arrangement (17; 30), which is mounted to the front frame portion (2). The lifting arrangement (17; 30) comprises a main arm (18), which is provided with a pivot connector (19) at a proximate end thereof and an equipment connector (20) at a distal end thereof, a main arm support means (21) for pivotably supporting the pivot connector (19) of the main arm (18), wherein the main arm support means (21) is movable in a direction which includes at least a component in the front-rear direction with respect to the front frame portion (2), and a main arm actuating element (24) for pivoting the main arm (18) such that the equipment connector (20) is movable between a lowered position and a lifted position, wherein the loader (1) is configured such that the pivot connector (19) is situated below at least a section (43.1) of the lower boundary (43) of the front window (13) in an operating position of the lifting arrangement (17; 30).