    • System and method for cooling hot-rolled steel strip
    • 用于冷却热轧钢带的系统和方法
    • JP2008207200A
    • 2008-09-11
    • JP2007044868
    • 2007-02-26
    • Jfe Steel KkJfeスチール株式会社
    • KAMIOKA SATOSHINAKADA NAOKIKUROKI TAKASHINISHIURA NOBUO
    • B21B45/02
    • C21D1/667B21B45/0218B21B45/0233C21D9/46F27D15/0206
    • PROBLEM TO BE SOLVED: To provide a system and a method for cooling a hot-rolled steel strip by which the steel strip is cooled at high cooling rate uniformly and stably when cooling water is supplied onto the upside of the hot-rolled steel strip. SOLUTION: This system is provided with upper header units 21 for supplying bar-shaped cooling water toward the upside of the steel strip 10. The upper header units 21 are composed of a first upper header group which comprises a plurality of first upper headers 21a arranged in the conveying direction and a second upper header group which comprises a plurality of second upper headers 21b arranged in the conveying direction and each of upper headers 21a, 21b of the first upper deader group and the second upper header group has piping composition provided with an ON-OFF mechanism 30 which makes the ON-OFF control (the control of the start and the stoppage of water injection) of the jetting (injection) of the bar-shaped cooling water possible respectively and independently. COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种用于冷却热轧钢带的系统和方法,其中当将冷却水供应到热轧的上侧时,钢带以高冷却速度均匀稳定地冷却 钢带。 解决方案:该系统设置有用于向钢带10的上侧供应棒状冷却水的上集管单元21.上集管单元21由第一上集管组构成,第一上集管组包括多个第一上 沿输送方向设置的集管21a和第二上集管组,其包括沿输送方向布置的多个第二上集管21b,以及第一上部冷却组和第二上集管组的上集管21a,21b各自具有管道组成 设置有可以分别独立地进行条形冷却水的喷射(喷射)的ON-OFF控制(控制注水开始和停止)的ON-OFF机构30。 版权所有(C)2008,JPO&INPIT