会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 83. 发明申请
    • COMBINED HEATING/HOT WATER SYSTEM FOR A VEHICLE
    • 组合供热/温水SYSTEM FOR A VEHICLE
    • WO2007095877A2
    • 2007-08-30
    • PCT/DE2006002277
    • 2006-12-19
    • WEBASTO AGFIUMIDINISI ALESSANDRO
    • FIUMIDINISI ALESSANDRO
    • B60H1/00364B60H1/2225B60H2001/00221F24D3/08F24D5/00
    • Combined heating/hot water system (10) for a vehicle (12), comprising an air heating device (14), at least one air duct (20, 22, 24), by means of which the air heating device (14) is connected by air to an interior (30) of the vehicle (12) for heating, a fan (18), by means of which air heated in the air heating device (14) may be introduced into the interior (30) of the vehicle (12) for heating, a hot water reservoir (16) arranged in a recess (15) in the air heating device (14), a first pipe duct (36), by means of which the hot water reservoir (16) may be hydraulically connected to a tap (34) in the vehicle (12) and a second pipe duct (38), by means of which the hot water reservoir (16) is hydraulically coupled to a water tank (32), wherein at least one of the pipe ducts (36, 38) is arranged in one of the air ducts (20, 22, 24).
    • 合并的加热/热水系统(10)一种用于车辆(12),具有的与该空气加热装置(14)的空气在技术上与待内加热的空气加热装置(14),至少一个空气通道(20,22,24)(30) 车辆(12)被耦合到一个风扇(18),借助加热它在空气加热装置(14)的空气进入车辆(12)的被加热的内部(30)的可被引入,(一个在空气加热装置14的凹部(15) )布置热水箱(16),(第一管36),以与所述热水箱的(热水贮存器16)液压地设置以与一个(在车辆12)取水点(34)耦合,以及第二管道(38) (16)液压地在空气通道(20,22,24)设置的一个连接到一个水箱(32)耦合,所述管道,其中至少一个(36,38)。
    • 89. 发明申请
    • TRANSPORTATION REFRIGERATION BULKHEAD
    • 运输制冷大容器
    • WO2013192296A1
    • 2013-12-27
    • PCT/US2013/046545
    • 2013-06-19
    • THERMO KING CORPORATION
    • SONNEY, Tye, ScottSWEAZEY, John, DavidSELVAM, Packiarajan
    • B60P3/20B60H1/32
    • B60H1/00364B29C44/1228B29K2075/00B29L2009/00B60H1/3229B60H1/3232B60P3/20B62D33/048Y10T29/49721
    • A bulkhead for a transport refrigeration unit (TRU) is provided. The bulkhead is configured to create optimal air flow on both a front side (e.g. the side where the condenser unit is located) and a rear side (e.g. the side where the evaporator unit is located) of the bulkhead, provide structural support for various components of the TRU, and provide a thermal barrier between the front side and the rear side. Also, the bulkhead is configured to include an access door and a service opening that allows a user to access TRU components located on the rear side of the bulkhead via the front side of the bulkhead. Further, the rear side of the bulkhead is configured to provide a removal support shelf that can be used as a resting surface or a sliding surface for removing components located on the rear side of the bulkhead out of the TRU from the front side of the TRU via the service opening by removing the access door.
    • 提供了运输制冷单元(TRU)的隔板。 舱壁构造成在舱壁的前侧(例如冷凝器单元的一侧)和后侧(例如蒸发器单元的一侧)上产生最佳的空气流,为各种部件提供结构支撑 并且在前侧和后侧之间提供热障碍。 此外,隔板被配置为包括通道门和维修口,其允许用户通过隔板的前侧来访问位于隔板后侧的TRU部件。 此外,隔板的后侧被构造成提供可用作搁置表面或滑动表面的移除支撑架,用于从TRU的前侧移除位于隔板的后侧上的部件脱离TRU 通过拆卸检修门通过维修口。