    • AUTOMATIC GENERATION SYSTEM OF REBAR SHOP DRAWING USING 3D MODEL
    • US20170185704A1
    • 2017-06-29
    • US15307449
    • 2016-07-27
    • Industry-Academic Cooperation Foundation, Dankook University
    • Chee Kyeong KIM
    • G06F17/50G06T19/20G06K9/62G06T15/20G06Q50/08G06K9/46
    • G06F17/5009G06F17/50G06F17/5004G06K9/00476G06K9/4604G06K9/6202G06Q50/08G06T11/00G06T15/205G06T19/20G06T2200/24G06T2219/2012G06T2219/2016
    • Disclosed is an automatic generation system of a rebar shop drawing using a three-dimensional model capable of rapidly creating a 2D rebar shop drawing including member reinforcement information and boundary region reinforcement information from the 2D structure drawing or 3D building information modeling data. The automatic generation system of a rebar shop drawing using a 3D model, the system including: a structure drawing processor configured to receive 2D structure drawing data where a member group is applied for every member; a member information processor configured to extract section information by member groups from member schedule data including section information and member reinforcement information of each member group and boundary region reinforcement information of each boundary region group by receiving the member schedule data; a 3D modeling processor configured to match the section information by members extracted from the member information processor with each member of the 2D structure drawing data received by the structure drawing processor to obtain a modeled 3D drawing; a boundary region information extractor configured to extract boundary region information of each member from the modeled 3D drawing from the 3D modeling processor; a boundary region information matching processor configured to match the extracted boundary region information of each member from the boundary region information extractor with each member of the 2D structure drawing data to allocate the matching result; a reinforcement information processor configured to generate rebar shop drawing data by matching the member reinforcement information of each member group and the boundary region reinforcement information of each boundary region group from the member schedule data with each member to which boundary region information of the 2D structure drawing data is allocated; and a rebar shop drawing creator configured to create and display a rebar shop drawing of a member selected by a user from the 2D structure drawing data storing reinforcement information of a member and a boundary region by the reinforcement information processor.
    • 99. 发明申请
    • RK Construction Process Patent
    • RK施工工艺专利
    • US20170024833A1
    • 2017-01-26
    • US14699439
    • 2015-07-20
    • Ram Menachem Katave
    • Ram Menachem Katave
    • G06Q50/08G06Q10/10
    • G06Q50/08G06Q10/103
    • This specific construction technique allows specified construction needs as stated in the contract with the developer to be met more effectively than traditional construction techniques. The present invention discloses a system and method for construction work fulfilled by the construction companies on behalf of a customer or developer. This construction process allows the construction company to better manage construction. The RK Construction Process, which is more efficient than “conventional” construction processes found in prior construction companies, specifies construction needs as stated in the contract between the contractor and the developer. The conventional construction process is the direct hiring of an hourly worker, while this process is the science of hiring a tradesman by contract until construction completion. The RK Construction Process Patent improves construction capabilities and limits the liability of loss of any given casualty or on site injury.
    • 这种具体的施工技术允许与开发商的合同中规定的具体施工需要比传统施工技术更有效地得到满足。 本发明公开了由施工公司代表客户或开发商履行的施工工作的系统和方法。 施工过程允许施工企业更好地管理施工。 RK施工过程比现有建筑公司发现的“常规”施工过程更有效率,指定承包商和开发商之间的合同规定的施工需求。 传统的施工过程是直接雇用小时工,而这个过程是通过合同聘用一名商人直到施工完成的科学。 RK施工过程专利提高施工能力,限制任何给定伤亡或现场伤害的损失责任。
    • 100. 发明授权
    • System and method for deriving storage tank operation plan
    • 取出储罐运行计划的系统和方法
    • US09513639B2
    • 2016-12-06
    • US14352656
    • 2012-10-19
    • OSAKA GAS Co., Ltd.
    • Kenji TsuzakiKaoru KawamotoTomohito OkamuraHiromasa TaniTomokazu UedaNobuaki HashimotoKeisuke KawataTakahito TanabeKouhei HaradaAtsushi NitandaToshihiro Nitta
    • G06Q50/08G05D9/12G06Q50/06G06Q10/06G06Q10/04
    • G05D9/12G06Q10/04G06Q10/06G06Q50/06
    • To derive a feasible solution for an operation plan problem for storage tanks for storing liquefied natural gas, which is a complicated mixed-integer non-linear problem, given tank initial state information, reception plan information, and feed plan information, two solving processes are executed alternately two or more times, respectively: a first solving process that replaces a mixed-integer non-linear programming problem with a mixed-integer linear programming problem by linear approximation of a non-linear expression in non-linear constraints containing the non-linear expression, and solves the problem to derive provisional solutions or final solutions for a reception pattern that prescribes a storage tank that is to receive liquefied natural gas, and a discharge pattern that prescribes a storage tank that is to discharge liquefied natural gas, and a second solving process that replaces a mixed-integer non-linear programming problem with a continuous non-linear programming problem by provisionally fixing a discrete variable in discrete form constraints containing the discrete variable, and solves the problem to derive provisional solutions or final solutions for transitions of storage quantity and storage heat quantity of liquefied natural gas in each storage tank.
    • 为了获得储存液化天然气储存罐的操作计划问题的可行解决方案,这是一个复杂的混合整数非线性问题,给定罐初始状态信息,接收计划信息和进料计划信息,两个求解过程是 交替执行两次或更多次:通过非线性表达式的非线性约束的线性近似来代替混合整数线性规划问题的混合整数非线性规划问题的第一求解过程, 线性表达式,并解决了为规定接收液化天然气的储罐的接收模式的临时解决方案或最终解决方案的解决问题,以及规定用于排出液化天然气的储罐的排放模式,以及 第二个解决过程,用连续的非线性规划问题来代替混合整数非线性规划问题 通过将离散变量暂时固定在离散变量的离散形式约束下,解决了每个储罐中液化天然气储存量和储存热量转换的临时解决方案或最终解决方案。