会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 41. 发明申请
    • Alternate Transmission Scheme for High Speed Packet Access (HSPA)
    • 高速数据包接入(HSPA)的备用传输方案
    • US20110280140A1
    • 2011-11-17
    • US12884631
    • 2010-09-17
    • Tom ChinGuangming ShiKuo-Chun Lee
    • Tom ChinGuangming ShiKuo-Chun Lee
    • H04W72/10H04W24/10H04B7/216
    • H04W72/1289
    • Transmission of certain channels between a User Equipment (UE) and a Node B (NB) in High Speed Packet Access (HSPA) of a Time Division-Synchronous Code Division Multiple Access (TD-SCDMA) network may be scheduled during a UE's idle intervals. Scheduled transmissions during a UE's idle interval result in lost system resources because the transmissions do not occur. A NB may prevent conflicts between scheduled transmissions and a UE's idle period by prohibiting transfer of certain channels a predetermined number of radio frames before the UE's idle period. Alternatively, the NB may schedule transmission of certain channels with a predetermined delay to prevent the channels from being scheduled during the UE's idle period.
    • 可以在UE的空闲间隔期间调度时分同步码分多址(TD-SCDMA)网络的高速分组接入(HSPA)中用户设备(UE)与节点B(NB)之间的某些信道的传输 。 在UE的空闲间隔期间的计划传输导致丢失的系统资源,因为不发生传输。 NB可以通过在UE的空闲周期之前禁止某些信道传送预定数量的无线帧来防止调度的传输与UE的空闲时段之间的冲突。 或者,NB可以以预定的延迟调度某些信道的传输,以防止在UE的空闲周期期间调度信道。
    • 42. 发明申请
    • FACILITATING OPEN LOOP POWER CONTROL IN TD-SCDMA MULTI-CARRIER SYSTEMS
    • 在TD-SCDMA多载波系统中实现开环功率控制
    • US20110261707A1
    • 2011-10-27
    • US12909699
    • 2010-10-21
    • Tom ChinGuangming ShiKuo-Chun Lee
    • Tom ChinGuangming ShiKuo-Chun Lee
    • H04W24/00
    • H04W52/10H04W52/146H04W52/16H04W52/42
    • Open loop power control in Time Division-Synchronous Code Division Multiple Access (TD-SCDMA) multi-carrier systems is facilitated through the determination of a value for open loop control on a primary carrier frequency which is then used to perform open loop control on at least one secondary carrier frequency in the multi-carrier system. This determined open loop control value may be applied using the value determined on the primary carrier frequency, or may be further adjusted using an estimated difference between received power of the primary carrier frequency and the secondary carrier frequencies, in selected aspects. When the pilot signals in the secondary carrier frequencies are transmitted at different power levels, this open loop control value may be further adjusted with a transmit power level offset.
    • 时分同步码分多址(TD-SCDMA)多载波系统中的开环功率控制通过确定主载波频率上的开环控制值而得到促进,然后用于对其进行开环控制 多载波系统中的至少一个次载波频率。 可以使用在主载波频率上确定的值来应用该确定的开环控制值,或者可以在选择的方面中使用主载波频率的接收功率与次载波频率之间的估计差进一步调整该确定的开环控制值。 当辅助载波频率中的导频信号以不同的功率电平发射时,可以用发射功率电平偏移进一步调整该开环控制值。
    • 50. 发明授权
    • Method and apparatus for maintaining communication during a baton handover
    • 用于在接力棒切换期间保持通信的方法和装置
    • US08830960B2
    • 2014-09-09
    • US13379612
    • 2010-03-31
    • Tom ChinGuangming ShiKuo-Chun Lee
    • Tom ChinGuangming ShiKuo-Chun Lee
    • H04W36/04
    • H04W36/0088H04W36/18H04W72/08
    • A method and apparatus enable high-speed downlink data transmissions to continue while a baton handover is in progress. In an aspect of the disclosure, a method of wireless communication includes switching an uplink from a source cell to a target cell while maintaining a downlink with the source cell, and transmitting over the uplink to the target cell at least one metric of quality of the downlink. In one example, the metric of quality may be a CQI. In another example, the metric of quality may be a HARQ ACK/NACK. The metric of quality of the downlink may be transmitted from the target cell to the source cell, directly or by way of a radio network controller.
    • 一种方法和装置能够在接力棒切换进行期间继续高速下行链路数据传输。 在本公开的一方面,一种无线通信方法包括:在从源小区到目标小区的上行链路切换的同时,保持与源小区的下行链路,并且通过上行链路向目标小区发送至少一个质量度量 下行链路。 在一个示例中,质量的度量可以是CQI。 在另一示例中,质量度量可以是HARQ ACK / NACK。 下行链路质量的度量可以直接地或者通过无线电网络控制器从目标小区发送到源小区。