会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 71. 发明申请
    • Process Scheduling Using Scheduling Graph to Minimize Managed Elements
    • 使用调度图进行过程调度以最小化受管元素
    • US20120222043A1
    • 2012-08-30
    • US13461745
    • 2012-05-01
    • Alexander G. GounaresCharles D. Garrett
    • Alexander G. GounaresCharles D. Garrett
    • G06F9/46
    • G06F9/4881
    • A process scheduler may use a scheduling graph to determine which processes, threads, or other execution elements of a program may be scheduled. Those execution elements that have not been invoked or may be waiting for input may not be considered for scheduling. A scheduler may operate by scheduling a current set of execution elements and attempting to schedule a number of generations linked to the currently executing elements. As new elements are added to the scheduled list of execution elements, the list may grow. When the scheduling graph indicates that an execution element will no longer be executed, the execution element may be removed from consideration by a scheduler. In some embodiments, a secondary scan of all available execution elements may be performed on a periodic basis.
    • 进程调度器可以使用调度图来确定可以调度程序的哪些进程,线程或其他执行元素。 那些未被调用或可能正在等待输入的执行元素可能不被考虑用于调度。 调度器可以通过调度当前的一组执行元素并尝试调度链接到当前执行元素的代数来操作。 当新的元素添加到计划的执行元素列表中时,列表可能会增长。 当调度图指示执行元件将不再被执行时,执行元件可以被调度器从考虑中移除。 在一些实施例中,可以周期性地执行所有可用执行元件的辅助扫描。