    • 86. 发明授权
    • Systems and methods for cascading photovoltaic structures
    • 用于级联光伏结构的系统和方法
    • US09590132B2
    • 2017-03-07
    • US14866776
    • 2015-09-25
    • SolarCity Corporation
    • Pablo GonzalezBobby Yang
    • B25B11/00H01L31/18H01L31/05
    • H01L31/188H01L31/0201H01L31/0504Y02E10/50
    • A string-forming system is described. The string-forming system may include at least a first cell-lifting mechanism and a second cell-lifting mechanism that can automatically arrange a set of strips of a photovoltaic structure into a cascaded formation. During operation, a controller can cause the first cell-lifting mechanism to lift a first strip from a first platform, and can cause the second cell-lifting mechanism to lift, from the first platform, a second strip that may follow the first strip on the first platform. The controller may then activate a first shifting actuator of the first cell-lifting mechanism or a second shifting actuator of the second cell-lifting mechanism to place a leading edge of the second strip above a trailing edge of the first strip.
    • 描述了弦形成系统。 弦线形成系统可以包括至少第一电池提升机构和第二电池提升机构,其可以将一组光伏结构的条带自动地布置成级联地层。 在操作期间,控制器可以使第一电池提升机构从第一平台抬起第一条带,并且可以使第二电池提升机构从第一平台升起第二条带,其可以跟随第一条带 第一个平台。 然后,控制器可以激活第一电池提升机构的第一移动致动器或第二电池提升机构的第二移动致动器,以将第二条带的前缘放置在第一条带的后缘上方。
    • 90. 发明申请
    • UTILITY PROVISIONING IN AN ENERGY RESOURCE SYSTEM
    • 能源资源系统中的实用性提供
    • US20160344187A1
    • 2016-11-24
    • US14794389
    • 2015-07-08
    • SolarCity Corporation
    • Brian ZimmerlyRyan Hanley
    • H02J3/38G06Q50/06G05B15/02G06Q30/02
    • H02J3/381G05B15/02G06Q30/0283G06Q50/06H02J3/46Y04S10/54Y04S50/14
    • Embodiments may include a method of adjusting power in a distributed generation management system. The method may include receiving, by a processor, real-time load requirement data of an energy resources (ER) site. The method may also include receiving, by the processor, real-time energy generation (EG) data from the ER site. The method may further include determining, by the processor, a net power generation at a first level from the real-time load requirement data and the real-time energy generation data. The method may include receiving, by the processor, a first request from a utility to increase or decrease the net power generation from the first level. The method may also include determining a benefit complying with the first request. The method may further include estimating a benefit of not complying with the first request. The method may also include determining whether the determined benefit is greater than the estimated benefit.
    • 实施例可以包括在分布式发电管理系统中调整功率的方法。 该方法可以包括由处理器接收能量资源(ER)站点的实时负载要求数据。 该方法还可以包括由处理器接收来自ER站点的实时能量产生(EG)数据。 该方法还可以包括由处理器确定来自实时负载需求数据和实时能量产生数据的第一级的净功率产生。 该方法可以包括由处理器接收来自公用事业的第一请求,以从第一级增加或减少净发电量。 该方法还可以包括确定符合第一请求的优点。 该方法还可以包括估计不符合第一请求的益处。 该方法还可以包括确定确定的利益是否大于估计的收益。