会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明授权
    • Method and arrangement
    • US11993482B2
    • 2024-05-28
    • US17569086
    • 2022-01-05
    • Kone Corporation
    • Markku HaapaniemiMatti RasanenSami SaarelaAnssi VenhoJanne MikkonenOtto LanzTarvo Viita-AhoEmil HagstromSimo MakimattilaKristian ViinikkalaPeter EaglingTimo RinnePetri Kere
    • B66B1/34B66B1/06B66B9/187B66B11/00
    • B66B1/3492B66B1/06B66B9/187B66B11/006
    • The invention relates to a method for transporting construction material and/or equipment inside a building under construction, wherein the building under construction comprises plurality of vertically displaced floors, the method comprising providing an elevator for transporting transport containers in the building under construction, said elevator comprising at least a load receiving unit vertically movable along one or more guide rail lines in an elevator shaft formed in the building under construction; and providing plurality of transport containers each comprising a container body, and an identification provided on the container body for identifying the container and/or its destination in the building, most preferably the destination floor in the building under construction; providing one or more detectors within the building under construction for detecting identifications of containers when they are within the detection ranges of the one or more detectors; moving a first transport container belonging to said plurality of transport containers to a loading floor; loading the first transport container belonging to said plurality of containers on the load receiving unit; determining by a control system destination floor of the first container comprising detecting the identification of the first transport container with a detector; automatically moving the load receiving unit vertically in the elevator shaft to the destination floor of the first container; and unloading the first transport container from the load receiving unit to the destination floor of said first container. The invention also relates to a method for constructing a building and an arrangement, which implement the aforementioned method.