    • INSTALLATION METHOD OF EQUIPMENT, ANCHOR MEMBER SUPPORTING MECHANISM AND ANCHOR BOLT UNIT
    • 设备安装方法,锚固构件支撑机构和锚固螺栓单元
    • US20140144025A1
    • 2014-05-29
    • US14166988
    • 2014-01-29
    • Toshiba Plant Systems & Services Corporation
    • Isao Hoshi
    • E04B1/00
    • E04B1/00E02D27/44E02D29/12F04D29/605Y10T29/49238Y10T29/49623Y10T29/49826
    • Efficiency of installation work of equipment such as an ECCS pump is enhanced. In an installation method of equipment, a pit can unit in which an upper side frame, a pit can, various reinforcing steels including vertical reinforcing bars reinforcing the above from a periphery, and an anchor plate supporting mechanism are integrated is manufactured in advance, and the pit can unit is placed on an MMR via a lower side frame. Further, an anchor bolt unit is disposed on the anchor plate supporting mechanism after primary concrete is deposited, a relative positional relationship of respective foundation bolts relative to the pit can is corrected by using a template, and secondary concrete is deposited under the state in which the positional relationship is corrected. After that, the ECCS pump is carried into the pit can, and an installation of the ECCS pump is completed by fixing the carried ECCS pump through the respective foundation bolts of which bottom sides are embedded.
    • 提高了ECCS泵等设备的安装工作效率。 在设备的安装方法中,预先制造将上侧框架,凹坑罐,包括从周边加强上述的垂直钢筋的各种增强钢和锚板支撑机构一体化的凹坑罐单元,并且 坑罐单元通过下侧框架放置在MMR上。 此外,在主要混凝土沉积之后,在锚板支撑机构上设置锚定螺栓单元,通过使用模板来校正各个地基螺栓相对于坑坑的相对位置关系,并且在第二混凝土在 校正位置关系。 之后,将ECCS泵送入坑罐,ECCS泵的安装通过固定所携带的ECCS泵通过嵌入底部的相应底座螺栓来完成。