
基本信息:
- 专利标题: 一种低压油藏侧钻井固井完井工艺
- 专利标题(英):Process for performing well drilling, well cementing and well completing at low-pressure oil reservoir side
- 申请号:CN201110278579.4 申请日:2011-09-12
- 公开(公告)号:CN102425394A 公开(公告)日:2012-04-25
- 发明人: 王春鹏 , 贾庆仲 , 宋金仕 , 彭钢 , 曹生 , 丁文正 , 孔冬梅
- 申请人: 联合石油天然气投资有限公司
- 申请人地址: 辽宁省盘锦市经济技术开发区高新产业园11号
- 专利权人: 联合石油天然气投资有限公司
- 当前专利权人: 联合石油天然气(盘锦)有限公司
- 当前专利权人地址: 辽宁省盘锦市经济技术开发区高新产业园11号
- 代理机构: 盘锦辽河专利代理有限责任公司
- 代理人: 刘恩宏
- 主分类号: E21B33/136
- IPC分类号: E21B33/136 ; E21B7/28
The invention relates to the technical field of well cementing and well completing for oil fields, in particular to a process for performing well drilling, well cementing and well completing at a low-pressure oil reservoir side. The process comprises the following steps of: A, reaming an original well bore after well drilling is completed at the low-pressure oil reservoir side; B, descending a well-completing casing pipe in the well bore after reaming is finished; C, descending a u-shaped pipe low-pressure well cementing device; D, descending a well-completing casing pipe provided with a cement basket; and E, cementing a well by adopting low-density cement. According to the invention, the well drilling and well cementing quality at the low-pressure oil reservoir side is increased, a fire flooding based oil reservoir exploiting effect is ensured, and the defects that the well cementing quality is poor and the exploitation and production of the oil reservoir are influenced because loss circulation is easily caused in a well cementing process of the prior art are overcome.
IPC结构图谱:
E | 固定建筑物 |
--E21 | 土层或岩石的钻进;采矿 |
----E21B | 土层或岩石的钻进;从井中开采油、气、水、可溶解或可熔化物质或矿物泥浆 |
------E21B33/00 | 井眼或井的密封或封隔 |
--------E21B33/02 | .地面密封或封隔 |
----------E21B33/12 | ..封隔器;封堵物 |
------------E21B33/136 | ...水泥伞,例如,伞型的 |