会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 21. 发明申请
    • ATTACHMENT BRACKET AND SUPPORT ASSEMBLY
    • 附件支架和支撑总成
    • WO2017029569A1
    • 2017-02-23
    • PCT/IB2016/054622
    • 2016-08-01
    • BOMBARDIER INC.SHORT BROTHERS PLC
    • GALLIEN, RenéDESHAIES, Martin
    • F16B11/00H02G3/00
    • H02G3/32F16B5/0685F16B7/0433F16B11/006F16B37/044F16B37/048
    • A support assembly (10) having a structural element (12) having first and second non-parallel adjoining surfaces (18), a bracket (14) attached to the structural element (12), and a component support (16). The bracket (14) has a first flange (20) including a first attachment surface (24) adhesively bonded to the first surface (18) of the structural element (12), a second flange (20) including a second attachment surface (24) adhesively bonded to the second surface (18) of the structural element (12), and a connection portion (48) interconnecting the first and second flanges (20), the connection portion (48) extending spaced from the structural element (12) such that a gap (52) is defined therebetween. The component support (16) is engaged to the first flange (20). The connection portion (48) may have a lower resistance to rupture than that of the first and second flanges (20). A method of removably securing a component to a structural element is also discussed.
    • 具有具有第一和第二非平行相邻表面(18)的结构元件(12)的支撑组件(10),附接到结构元件(12)的支架(14)和部件支撑件(16)。 支架(14)具有第一凸缘(20),第一凸缘(20)包括粘合地结合到结构元件(12)的第一表面(18)的第一附接表面(24);第二凸缘(20),包括第二附接表面 )连接到所述结构元件(12)的第二表面(18),以及连接所述第一和第二凸缘(20)的连接部分(48),所述连接部分(48)与所述结构元件(12)间隔开延伸, 使得它们之间限定间隙(52)。 部件支撑件(16)接合到第一法兰(20)。 连接部分(48)可以具有比第一和第二凸缘(20)的抗破坏性更低的抗破坏性。 还讨论了将组件可移除地固定到结构元件的方法。
    • 24. 发明申请
    • COMBINED AIRCRAFT MAINTENANCE ROUTING AND MAINTENANCE TASK SCHEDULING
    • 组合航空维修路线和维护任务调度
    • WO2016157099A1
    • 2016-10-06
    • PCT/IB2016/051807
    • 2016-03-30
    • BOMBARDIER INC.SHORT BROTHERS PLC
    • SAFAEI, Nima
    • G06Q10/06G06Q10/00
    • G06Q10/20G06Q10/06G06Q10/0631G06Q10/1097G06Q50/28
    • A method and system for coordinating aircraft maintenance routing and scheduling for a fleet of aircraft over a given time period is described. The method comprises receiving an initial list of due maintenance tasks based on aircraft information of the fleet and a proposed fleet utilization distribution; generating a set of aircraft routes for the fleet, the routes comprising maintenance opportunities for the due maintenance tasks, the due maintenance tasks being considered as aggregated maintenance constraints for generation of the aircraft routes; scheduling the due maintenance tasks into the maintenance opportunities while respecting target due dates; and in case of infeasibility for maintenance task scheduling within the maintenance opportunities of the aircraft routes, regenerating the set of aircraft routes for the fleet using the aggregated maintenance constraints and additional constraints, and rescheduling the due maintenance tasks using the regenerated set of aircraft routes.
    • 描述了用于在给定时间段内协调飞机维修路线和调度的方法和系统。 该方法包括基于机队的飞机信息和提出的舰队利用分布来接收适当维护任务的初始列表; 为船队生成一套飞机航线,路线包括适当维护任务的维护机会,适当的维护任务被认为是生成飞机航路的总体维护限制; 将适当的维护任务安排到维护机会,同时遵守目标到期日; 并且在飞机路线的维护机会内的维护任务调度不可行的情况下,使用汇总的维护约束和附加约束再生该组航空器航线,并且使用再生的一组航空器路线重新安排适当的维护任务。