会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 51. 发明授权
    • Undercut excavation with protection against seismic events or excessive
ground movement
    • 底切开挖,防止地震事件或地面运动过度
    • US5944453A
    • 1999-08-31
    • US57874
    • 1998-04-09
    • Charles M. Gryba
    • Charles M. Gryba
    • E02D17/00E02D27/34E02D29/045E02D5/30
    • E02D29/045E02D17/00E02D2250/00
    • An undercut excavation method is provided, which is particularly suitable as an undercut-and-fill mining method, wherein concrete posts are inserted into holes drilled in the ground and are used to support a concrete floor poured on their top ends, which serves as a roof for the lower excavation level. The bottom ends of these posts rest on resilient elements to provide protection against seismic events or excessive ground movements. Excavation beneath such roof is thereby safely carried out in areas prone to seismic events such as rock bursts or earth quakes or to excessive ground movements. The concrete posts may be attached to the resilient elements at their bottom ends, thereby producing yielding posts suitable for such excavation. For still greater safety, a double post system may be used, which involves placing a second post beside the first after excavation on a given level and tying them all together with the concrete used to make the floor/roof for the next lower level of excavation. In mining this is called double-post mining or DPM.
    • 提供了一种底切挖掘方法,其特别适合作为底切和开采方法,其中将混凝土柱插入钻入地下的孔中,并用于支撑浇注在其顶端上的混凝土地板,其用作 屋顶为较低的挖掘水平。 这些柱的底端位于弹性元件上,以提供防止地震事件或过大地面运动的保护。 因此,在这样的屋顶下的挖掘由此可以安全地进行在诸如岩石爆发或地震之类的地震事件的地区或过度的地面运动。 混凝土柱可以在其底端处附接到弹性元件,从而产生适合于这种挖掘的屈服柱。 为了更大的安全性,可以使用双柱系统,其中包括在给定水平上的第一次挖掘之后放置第二柱,并将它们与用于制造地板/屋顶的混凝土捆绑在一起,用于下一较低的挖掘水平 。 在采矿中,这称为双后采矿或DPM。
    • 52. 发明授权
    • Method for excavating rock cavities
    • 挖掘岩洞的方法
    • US5855452A
    • 1999-01-05
    • US719007
    • 1996-09-24
    • Karl Ivar Sagefors
    • Karl Ivar Sagefors
    • E02D29/045E21D13/00E21D13/02E02D29/00
    • E21D13/00
    • In a method for excavating rock cavities in the form of substantially cylindrical, vertical or low placed rock cavities for the storage of gas, fluid, solid products or for another purpose, one first, from a transport tunnel (2), excavates an upper circular room (3). From this circular room (3), one excavates the roof shape of the rock cavity (1) to be; and then, from a second transport tunnel (7) excavates a second annular tunnel (5) from a middle level in the rock cavity (1) to be. From the second transport tunnel (7), one also excavates a lower circular room (8) situated on a level which is substantially at the level where the lowest level of the rock cavity (1) to be, is. At this lowest level one excavates a third annular tunnel (13); between the circular room (8) and the third annular tunnel (13) provides tap holes (9). From the second annular tunnel (5), stopping is carried out in a substantially annular vertical or inclined zone from the middle level to the lowest level and removes blasted rock mass through the tap holes (9). One then separates a substantially conical roof volume (10) above the annular room (8) whereafter, finally, a remaining, central, substantially cylindrical rock pillar (14), substantially placed above the annular room (8), is blasted completely or partly at one or more events and rock mass obtained is removed via the tap holes (9).
    • 在用于开采用于储存气体,流体,固体产品或用于另一目的的大致圆柱形,垂直或低放置的岩石腔形式的岩石腔的方法中,首先从运输隧道(2)挖掘上部圆形 房间(3)。 从这个圆形房间(3),一个挖掘岩腔(1)的屋顶形状; 然后从第二输送隧道(7)从岩腔(1)中的中间层挖出第二环形隧道(5)。 从第二运输隧道(7)还可以挖出位于水平面上的下部圆形房间(8),该水平面基本上处于要成为岩层(1)的最低水平的水平面上。 在这个最低层,挖掘第三个环形隧道(13); 在圆形室(8)和第三环形通道(13)之间提供抽头孔(9)。 从第二环形通道(5)开始,在从中间水平到最低水平的大致环形的垂直或倾斜区域中进行停止,并且通过排水孔(9)去除爆破的岩体。 然后,将环形室(8)上方的基本上圆锥形的屋顶容积(10)分离开,然后,最后,基本上放置在环形室(8)上方的剩余的中心的基本圆柱形的岩石柱(14)被完全地或部分地喷射 在一个或多个事件中,获得的岩体通过排水孔(9)被去除。
    • 56. 发明授权
    • Process for holding up the lateral walls of deep ditches
    • 夹紧深沟沟侧壁的工艺
    • US4900197A
    • 1990-02-13
    • US229224
    • 1988-08-05
    • Jacob Ward
    • Jacob Ward
    • E02D17/08E02D20060101E02D27/30E02D29/045E02D31/10
    • E02D29/045
    • The invention relates to a process for propping or supporting the vertical support walls of deep ditches.After having freely constructed the ditch, to a depth compatible with the resistance of the support walls (1), a ring-shaped plate (3) is provided at the bottom of the ditch, which bears at its periphery against the vertical support walls (1), and which rests on the bottom of the ditch; after the setting of this ring-shaped plate (3), it is attached to the upper part of the support walls (1) for being supported, by means of braces (5); and then, the ditchs is continued, through the orifice (4) of the ring-shaped plate (3), down to the bottom of the work.
    • 本发明涉及一种用于支撑或支撑深沟渠垂直支撑壁的方法。 在自由地构造沟槽之后,在与支撑壁(1)的抵抗力相适应的深度处,在沟槽的底部设置有环形板(3),其在其周边处抵靠垂直支撑壁( 1),位于沟渠底部; 在该环形板(3)的设置之后,通过支架(5)将其安装到支撑壁(1)的上部以被支撑。 然后,通过环形板(3)的孔口(4),沟槽继续下降到工件的底部。