会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Distribution system analysis using meter data
    • 配电系统分析采用仪表数据
    • US08386200B2
    • 2013-02-26
    • US13334504
    • 2011-12-22
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • G06F19/00
    • G01R21/1331G01R19/2513Y02E60/728Y04S10/265
    • A monitoring system includes a first sensor positioned at a first location along a phase conductor line and a second sensor position at a second location along the phase conductor line. The first sensor is configured to generate a first set of synchrophasor data. The second sensor is configured to generate a second set of synchrophasor data. The monitoring system includes a processor configured to receive the first and second sets of synchrophasor data. The processor is further configured to determine a primary side voltage of at least one distribution transformer electrically connected to the phase conductor line based on a secondary side voltage of the at least one distribution transformer. The processor is further configured to determine at least one phase conductor line condition based on the first and second sets of synchrophasor data and the primary side voltage.
    • 监测系统包括位于沿着相导线的第一位置处的第一传感器和沿着相导线的第二位置处的第二传感器位置。 第一传感器被配置为生成第一组同步信息数据。 第二传感器被配置为生成第二组同步信息数据。 监视系统包括被配置为接收第一组和第二组同步信息数据的处理器。 处理器还被配置为基于至少一个配电变压器的次级侧电压来确定电连接到相导线的至少一个配电变压器的初级侧电压。 处理器还被配置为基于第一组和第二组同步信号数据和初级侧电压来确定至少一个相导线条件。
    • 7. 发明申请
    • DISTRIBUTED INTELLIGENCE ARCHITECTURE WITH DYNAMIC REVERSE/FORWARD CLOUDING
    • 分布式智能建筑与动态反向/前向云
    • US20120310423A1
    • 2012-12-06
    • US13483873
    • 2012-05-30
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • G06F1/26
    • H02J13/0013G06Q50/06Y02B90/2607Y02P80/11Y04S40/12
    • In one embodiment, a grid application function is hosted at a primary grid device in a utility grid, which may determine whether or not to distribute at least a portion of the grid application function to one or more distributed secondary grid devices in the utility grid. In general, the one or more distributed secondary grid devices will be associated with a subset of the utility grid that is associated with the primary grid device (e.g., a sub-grid). Once a determination has been made, the primary grid device may dynamically distribute the grid application function, or a portion thereof, to the distributed secondary devices according to the determination. In addition, in another embodiment, the grid application function may also be withdrawn, such as from a particular secondary grid device or else from the primary grid device to an originating grid device.
    • 在一个实施例中,网格应用功能被托管在公用电网中的主网格设备处,其可以确定是否将网格应用功能的至少一部分分发到公用电网中的一个或多个分布式次网格设备。 通常,一个或多个分布式二次栅格器件将与与主栅格器件(例如,子栅格)相关联的公用电网的子集相关联。 一旦做出了确定,主网格设备可以根据确定动态地将网格应用功能或其一部分分发到分布式辅助设备。 另外,在另一个实施例中,网格应用功能也可以被撤回,例如从特定的次级网格设备,或从主网格设备到源网格设备。