    • 3. 发明授权
    • Workflow model for coordinating the recovery of IT outages based on integrated recovery plans
    • 基于综合恢复计划协调IT中断恢复的工作流模型
    • US08265980B2
    • 2012-09-11
    • US12427083
    • 2009-04-21
    • Georg OchsJuergen P. SchneiderThomas StarzJeremias Werner
    • Georg OchsJuergen P. SchneiderThomas StarzJeremias Werner
    • G07F7/00G06F11/00
    • G06Q10/10G06Q10/0633
    • One aspect of the present invention provides a workflow model to effectively respond to outage events within an IT infrastructure. This workflow model enables a combination of manual and automated processing to effectively deploy a flexible, plannable, and testable recovery to outages and problems encountered within IT infrastructure settings. In one embodiment, a shared processing context is created to accompany the operations of the workflow, thereby collecting useful data in one location related to events and status information during the outage and the outage response. Within the workflow, analysis of the outage event is performed, an appropriate recovery plan is selected, the selected recovery plan is implemented, and recovery to the outage event is completed. Data collected within the processing context can be analyzed to obtain post mortem analysis and continuous service improvements. Accordingly, the improvements can be implemented within the IT infrastructure directly or within the appropriate recovery plan.
    • 本发明的一个方面提供了一种有效应对IT基础设施内的中断事件的工作流模型。 此工作流模型可实现手动和自动化处理的组合,以有效部署灵活,可计划和可测试的恢复,以便IT基础架构设置中遇到的中断和问题。 在一个实施例中,创建共享处理上下文以伴随工作流的操作,从而在中断和中断响应期间在与事件和状态信息相关的一个位置中收集有用数据。 在工作流程中,执行中断事件的分析,选择适当的恢复计划,实施所选的恢复计划,并完成对中断事件的恢复。 可以分析在处理环境中收集的数据,以获得验尸分析和持续服务改进。 因此,可以直接或在适当的恢复计划内在IT基础架构内实施改进。
    • 4. 发明申请
    • WORKFLOW MODEL FOR COORDINATING THE RECOVERY OF IT OUTAGES BASED ON INTEGRATED RECOVERY PLANS
    • 基于综合恢复计划协调恢复IT失效的工作流模型
    • US20100268568A1
    • 2010-10-21
    • US12427083
    • 2009-04-21
    • Georg OchsJuergen P. SchneiderThomas StarzJeremias Werner
    • Georg OchsJuergen P. SchneiderThomas StarzJeremias Werner
    • G06Q10/00
    • G06Q10/10G06Q10/0633
    • One aspect of the present invention provides a workflow model to effectively respond to outage events within an IT infrastructure. This workflow model enables a combination of manual and automated processing to effectively deploy a flexible, plannable, and testable recovery to outages and problems encountered within IT infrastructure settings. In one embodiment, a shared processing context is created to accompany the operations of the workflow, thereby collecting useful data in one location related to events and status information during the outage and the outage response. Within the workflow, analysis of the outage event is performed, an appropriate recovery plan is selected, the selected recovery plan is implemented, and recovery to the outage event is completed. Data collected within the processing context can be analyzed to obtain post mortem analysis and continuous service improvements. Accordingly, the improvements can be implemented within the IT infrastructure directly or within the appropriate recovery plan.
    • 本发明的一个方面提供了一种有效应对IT基础设施内的中断事件的工作流模型。 此工作流模型可实现手动和自动化处理的组合,以有效部署灵活,可计划和可测试的恢复,以便IT基础架构设置中遇到的中断和问题。 在一个实施例中,创建共享处理上下文以伴随工作流的操作,从而在中断和中断响应期间在与事件和状态信息相关的一个位置中收集有用数据。 在工作流程中,执行中断事件的分析,选择适当的恢复计划,实施所选的恢复计划,并完成对中断事件的恢复。 可以分析在处理环境中收集的数据,以获得验尸分析和持续服务改进。 因此,可以直接或在适当的恢复计划内在IT基础架构内实施改进。