会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明申请
    • LIFTING ARM ARRANGEMENT FOR LIFTING A PIPE, AND A METHOD FOR OPERATING SAME LIFTING ARM ARRANGEMENT
    • 提升用于提升管道的臂布置的方法以及操作同步升降臂布置的方法
    • US20160251915A1
    • 2016-09-01
    • US15030599
    • 2014-09-29
    • MHWIRTH AS
    • PER MORTEN LOEVSLAND
    • E21B19/14B66F11/00
    • E21B19/14B66F11/00E21B19/087E21B19/15
    • A lifting arm arrangement includes a gripper head arm, a lifting arm, and a lifting cylinder. A gripper head is fastened to a first gripper head arm end. A first lifting arm end is pivotally connected to the gripper head arm. A second lifting arm end is pivotally connected to a stationary lifting cylinder part. A second gripper head arm end is pivotally connected to a movable lifting cylinder part. The stationary lifting cylinder part comprises a cylinder with a cylinder cavity having first and second cylinder openings. A piston rod with a piston is arranged in the cylinder cavity. A first piston rod portion projects from a first piston end of the piston. A second piston rod portion projects from an opposite second piston end of the piston. Working areas of the first and second piston ends are substantially equal to each other.
    • 提升臂装置包括夹头头臂,提升臂和提升缸。 夹头头部固定在第一夹头头臂端。 第一提升臂端枢转地连接到夹持器头臂。 第二提升臂端枢转地连接到固定的提升缸部分。 第二夹头头臂端枢转地连接到可动提升缸部分。 固定提升缸部分包括具有气缸腔的气缸,其具有第一和第二气缸开口。 具有活塞的活塞杆布置在气缸腔中。 第一活塞杆部从活塞的第一活塞端突出。 第二活塞杆部分从活塞的相对的第二活塞端突出。 第一和第二活塞端部的工作区域基本上彼此相等。
    • 9. 发明申请
    • LIFTING ARRANGEMENT FOR LIFTING A PIPE
    • 提升管件提升安排
    • US20160115748A1
    • 2016-04-28
    • US14897649
    • 2014-06-13
    • MHWIRTH AS
    • Gjerulf OTTERSLAND
    • E21B19/15
    • E21B19/155E21B19/15
    • A lifting arm arrangement for lifting a pipe includes a pipe stacking tool comprising a first end, a second end, and a pipe handling head arranged at the second end. The pipe handling head is configured to grip around the pipe. A gripper head is connected to the first end of the pipe stacking tool. A tilt shaft is configured to connect the pipe stacking tool and the gripper head so as to form an articulated joint. The articulated joint comprises a locked position in which the pipe stacking tool is prevented from tilting about the tilt shaft, and a neutral position in which the pipe stacking tool is allowed to tilt about the tilt shaft.
    • 用于提升管道的提升臂装置包括管道堆叠工具,其包括第一端,第二端和布置在第二端的管道处理头。 管道处理头构造成夹紧管道。 夹头头连接到管堆叠工具的第一端。 倾斜轴构造成连接管道堆叠工具和夹持头,以形成铰接接头。 铰接接头包括锁定位置,在该位置中,防止管道堆叠工具围绕倾斜轴倾斜,并且允许管道堆叠工具绕倾斜轴倾斜的中间位置。
    • 10. 发明申请
    • APPARATUS FOR LIFTING AND/OR MOVING OPERATIONS OF DRILLING EQUIPMENT
    • 钻井设备的提升和/或移动操作的装置
    • US20160032665A1
    • 2016-02-04
    • US14781914
    • 2014-04-09
    • MHWIRTH AS
    • Erik MYKLEBUST
    • E21B19/00
    • E21B19/00E21B19/14
    • An apparatus for lifting and/or moving operations of drilling equipment on a deck, the apparatus includes a load-bearing device, a synchronizing device, a synchronizing linkage comprising at least one guide which receives the synchronizing device, and a suspension device comprising at least one lifting arm. The at least one lifting arm comprises a first torque arm and a second torque arm. The first torque arm comprises a first end connected to the suspension device, and a second end connected to the synchronizing linkage so as to provide a first synchronizing link. The second torque arm comprises a first end connected to the synchronizing linkage so as to provide a second synchronizing link, and a second end connected to the load-bearing device. The first torque arm and the second torque arm are respectively further connected via the first synchronizing link and the second synchronizing link to the synchronizing device.
    • 一种用于在甲板上提升和/或移动钻井设备的操作的装置,该装置包括承载装置,同步装置,包括至少一个接收同步装置的导向件的同步联动装置,以及包括至少包括 一个提升臂。 所述至少一个提升臂包括第一扭矩臂和第二扭矩臂。 第一扭矩臂包括连接到悬挂装置的第一端和连接到同步连杆的第二端,以便提供第一同步连杆。 第二扭矩臂包括连接到同步连杆的第一端,以便提供第二同步连杆,以及连接到承载装置的第二端。 第一转矩臂和第二转矩臂分别经由第一同步链路和第二同步链路进一步连接到同步装置。