会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Reducing sand production from a well formation
    • 从井井减少砂产量
    • US06431278B1
    • 2002-08-13
    • US09680124
    • 2000-10-05
    • Frederic GuinotJun ZhaoSimon G. James
    • Frederic GuinotJun ZhaoSimon G. James
    • E21B4317
    • E21B49/00E21B43/02E21B43/267
    • A method and apparatus for performing sand control using fracturing is described. A curve is defined that correlates the percentage of flow through out-of-phase perforations (those perforations not aligned with fractures) with the fracture conductivity over formation permeability. Given a desired production flow, formation conductivity may be defined. This allows the well operator to perform the proper fracturing operation to achieve the desired fracture conductivity. Alternatively, after a well has been fractured, and sand production is observed, a critical flow rate and the corresponding drawdown pressure can be calculated to prevent sand production.
    • 描述了使用压裂进行砂控制的方法和装置。 定义了一个曲线,其将通过异相穿孔(那些穿孔与裂缝不对齐)的流量的百分比与断层电导率相比较地层渗透率相关联。 给定期望的生产流程,可以定义地层导电性。 这允许井操作者进行适当的压裂操作以获得所需的断裂导电性。 或者,在井已经断裂并且观察到砂产生之后,可以计算临界流量和相应的压降压力以防止产沙。
    • 10. 发明授权
    • Methods for completing thermal-recovery wells
    • 完成热回收井的方法
    • US08392158B2
    • 2013-03-05
    • US12839598
    • 2010-07-20
    • Simon G. James
    • Simon G. James
    • G06F17/50
    • E21B33/14C09K8/42
    • Methods for completing a well involve the use of computational models to design cement systems that are appropriate for the anticipated well conditions. Data from laboratory tests and/or numerical simulations may be employed in the models. The cement systems are designed to have a higher Young's modulus than the surrounding formation. In addition, the cement systems contain chemical-expansion agents that cause a microannulus to be deliberately formed at the cement/casing interface prior to the application of heat. The microannulus disappears during application of heat, pressure or both owing to casing expansion.
    • 完成井的方法涉及使用计算模型来设计适合于预期井条件的水泥系统。 模型中可以采用来自实验室测试和/或数值模拟的数据。 水泥系统设计成具有比周围地层更高的杨氏模量。 此外,水泥系统包含化学膨胀剂,其在施加热量之前导致在水泥/壳体界面上有意形成微小环。 由于套管膨胀,在施加热,压力或两者时,微量消失。