会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • FILM PASTING DEVICE AND METHOD
    • 电影胶片装置及方法
    • US20130319606A1
    • 2013-12-05
    • US13482610
    • 2012-05-29
    • Bin GuoWei HuangChing-Feng Hsieh
    • Bin GuoWei HuangChing-Feng Hsieh
    • B32B37/10B32B37/12
    • H01H13/705H01H13/88H01H2229/034H01H2229/042H01L21/67132H05K3/303H05K2203/167Y10T156/10
    • A film pasting device and method for pasting a circuit board and a dome array together are disclosed. The device includes: a carrier having at least a suction hole, a support member connected to the carrier and having a plurality of air holes, a suction member connected to the carrier, and a first positioning member disposed on the carrier. The film pasting device includes: positioning the dome array, providing a suction force for sucking the dome array so as to evenly dispose the dome array, disposing the circuit board on the dome array, and providing a pressing force to press the circuit board to the dome array. Therefore, the present invention overcomes the conventional difficulty of aligning the dome array with the circuit board, thereby improving the product yield.
    • 公开了一种将电路板和圆顶阵列粘贴在一起的胶片粘贴装置和方法。 该装置包括:具有至少吸入孔的载体,连接到载体并具有多个气孔的支撑构件,连接到载体的抽吸构件和布置在载体上的第一定位构件。 膜贴装置包括:定位圆顶阵列,提供用于吸入圆顶阵列的吸力,以均匀地配置圆顶阵列,将电路板放置在圆顶阵列上,并提供按压力以将电路板按压到 圆顶阵列 因此,本发明克服了将圆顶阵列与电路板对准的常规难题,从而提高了产品产量。
    • 8. 发明授权
    • Methods for determining resistance or susceptibility to HIV entry inhibitors
    • 确定对HIV进入抑制剂的抵抗力或敏感性的方法
    • US09506121B2
    • 2016-11-29
    • US11921751
    • 2006-06-06
    • Wei Huang
    • Wei Huang
    • C12Q1/70
    • C12Q1/703C12Q2600/156C12Q2600/158
    • The invention provides a method for determining whether a human immunodeficiency virus is likely to be more resistant to a viral entry inhibitor than a reference HIV. In certain aspects, the methods comprise comparing the length of one or more variable regions of an envelope protein of the HIV or a number of glycosylation sites on the envelope protein of the HIV to a length of one or more corresponding variable regions of an envelope protein of the reference HIV or a number of glycosylation sites on the envelope protein of the reference HIV, wherein the HIV is likely to be more resistant to the CD4 binding site entry inhibitor than the reference HIV when the HIV has longer variable regions than the reference HIV or the HIV has more glycosylation sites than the reference HIV.
    • 本发明提供了一种用于确定人类免疫缺陷病毒是否比参照HIV更可能对病毒进入抑制剂更具抗性的方法。 在某些方面,所述方法包括将HIV的包膜蛋白的一个或多个可变区的长度或HIV的包膜蛋白上的多个糖基化位点的长度与包膜蛋白的一个或多个相应可变区的长度进行比较 参考HIV或参考HIV的包膜蛋白上的多个糖基化位点,其中当艾滋病毒具有比参考HIV更长的可变区时,HIV比参照HIV更可耐CD4结合位点进入抑制剂 或者HIV比参考HIV具有更多的糖基化位点。
    • 9. 发明授权
    • Predicting energy savings
    • 预测节能
    • US09329670B2
    • 2016-05-03
    • US13488822
    • 2012-06-05
    • Malcolm S. Allen-WareWei HuangFadi M. KassemKarthick RajamaniTodd J. RosedahlGuillermo J. Silva
    • Malcolm S. Allen-WareWei HuangFadi M. KassemKarthick RajamaniTodd J. RosedahlGuillermo J. Silva
    • G01F1/32G06F1/32
    • G06F1/329Y02D10/24
    • A mechanism is provided for estimating energy/power consumption of a fixed-frequency operating mode while system is running in dynamic power management mode. For each time interval in a plurality of time intervals within a time period: a first processor identifies a modeled total nominal power value for at least one second processor during a current time interval, stores the modeled total nominal power value for the current time interval in a storage, identifies a dynamic power management mode power value for the at least one second processor in the data processing system during the current interval, and stores the dynamic power management mode power value for the current time interval in the storage. Responsive to the time period expiring, a comparison is produced of a plurality of modeled total nominal power values and a plurality of dynamic power management mode power values over the time period.
    • 提供了一种用于在系统以动态功率管理模式运行时估计固定频率操作模式的能量/功率消耗的机制。 对于在一段时间段内的多个时间间隔中的每个时间间隔:第一处理器在当前时间间隔期间识别至少一个第二处理器的建模总额定功率值,将建模的总额定功率值存储在当前时间间隔中 存储器,在当前间隔期间识别数据处理系统中的至少一个第二处理器的动态功率管理模式功率值,并将当前时间间隔的动态功率管理模式功率值存储在存储器中。 响应于时间段到期,在该时间段内产生多个建模的总额定功率值和多个动态功率管理模式功率值的比较。
    • 10. 发明申请
    • Adaptive Private Network with Dynamic Conduit Process
    • 具有动态管道过程的自适应私有网络
    • US20160072706A1
    • 2016-03-10
    • US14481335
    • 2014-09-09
    • Wei HuangTodd MartinJustin Allen PattersonRobert W. Dickey, IIIAnthony Matteo Gallo
    • Wei HuangTodd MartinJustin Allen PattersonRobert W. Dickey, IIIAnthony Matteo Gallo
    • H04L12/721H04L12/751
    • Systems and techniques, including special messages and state machines, are described that configures an intermediate site to dynamically trigger creation of and removal of a dynamic conduit between two sites based on usage that is tracked at the sites. The intermediate site providing WAN-to-WAN forwarding between the two sites, monitors throughput statistics on each local WAN link (LWL) associated with the two sites. If traffic between the two sites passes a configured first threshold or if LWL usage passes a configured second threshold, the intermediate site sends a message to the two sites to set up a dynamic conduit directly coupling the two sites. Busy lists are used to keep track of eligible site pairs. Once a dynamic conduit is set up between two sites, a grow technique tests the dynamic conduit increasing communication flows between the two sites each configured sampling period before putting the conduit in normal use.
    • 描述了包括特殊消息和状态机的系统和技术,其基于在站点处跟踪的使用,配置中间站点以动态地触发两个站点之间的动态管道的创建和移除。 在两个站点之间提供WAN到WAN转发的中间站点监视与两个站点相关联的每个本地WAN链路(LWL)上的吞吐量统计。 如果两个站点之间的流量通过配置的第一阈值,或者如果LWL使用通过配置的第二阈值,则中间站点向两个站点发送消息以建立直接耦合两个站点的动态管道。 繁忙的列表用于跟踪符合条件的网站对。 一旦在两个站点之间建立了一个动态管道,增长技术将测试动态管道,增加两个站点之间的通信流量,每个站点在配置采样周期之前将管道正常使用。