会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method and System for Early Warning the Quality and Safety of Cross-border Renewable Resources
    • AU2021102081A4
    • 2021-06-03
    • AU2021102081
    • 2021-04-20
    • UNIV BEIJING SCIENCE & TECHNOLOGY
    • HUANG GUOZHONGZHANG MENGRUOU SHENGNANXIE JIAYINGZHANG DINGLI
    • G06Q10/06G06Q50/26
    • The invention relates to the field of early warning, in particular to a method and a system for early warning the quality and safety of cross-border renewable resources. The method comprises collection of risk information of cross-border renewable resources, which includes basic factors and additional factors; preliminary judgement on the risk grade of the basic factors and additional factors respectively, wherein the risk grade of the basic factors is obtained by adopting the maximum principle and the risk grade of the additional factors is obtained through the membership principle. Specifically, the risk grade contains low grade, medium grade and high grade; if the risk grade is high, quality and safety early warning will be issued for cross border renewable resources. According to the method, the collected risk information is preliminarily evaluated, and the early warning is directly issued for high grade risk. Besides, secondary comprehensive early warning evaluation is carried out for medium and low risk grade which cannot be clearly defined. The multi-stage early warning process can effectively improve the early warning efficiency and facilitate the early warning work. There are problems a n Lack of quamntin o e Lack of relevant with raw materials. supervision policy standards Radioactivity,i Appearance, sensory, toxic substances, polymer, ash, etc. inclusions, microorganisms,e r risk Me gger FAccumulatiofon N Issue early warning y Possible exposure to the human body/environent in time. environmentiuman body Exceeding the y environmental/u Lead to risk tolerance threshold Figure 3 A risk mechanism diagram of one embodiment of the early warning method for the quality and safety of cross-border renewable resources according to the present invention. InputProcessor MemoryOutput device Figure 4 A frame diagram of one embodiment of the early warning system for the quality and safety of cross-border renewable resources according to the present invention.