会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 10. 发明授权
    • 철도의 급구배 구간에서의 열차견인장치
    • 在斜轨列车辅助驾驶系统
    • KR101447074B1
    • 2014-10-06
    • KR1020130110878
    • 2013-09-16
    • 한국철도기술연구원
    • 안성권이준석방춘석사공명
    • B61J3/08B61J3/04
    • B61J3/04B61D15/00B61D49/00B61F13/00
    • The present invention relates to a device to tow a train in a steep grade section of a railway installed around a main track in a steep grade section of a railway having a steep upward slope to tow a train while moving in a state of being coupled to the train when the train enters the steep grade section in order to enable the train to smoothly pass the steep grade section. The device to tow a train in a steep grade section of a railway includes: a first auxiliary track (1a) and a second auxiliary track (1b) installed in an upward steep grade section; a hinge mounting stand (2) and a backward mounting stand (4) moving in the steep grade section along the first auxiliary track (1a); a forward mounting stand (5) moving in the steep grade section along the second auxiliary track (1b); and a connection beam (3). In a tow beginning point, each of the hinge mounting stand (2), the backward mounting stand (4), and the forward mounting stand (4) tows the train (200) while moving in the upward steep grade section along the first auxiliary track (1a) and the second auxiliary track (1b) while the connection beam (3) is arranged by crossing the main track (100) to be coupled to the train (200). In a tow ending point, after the train (200) is passed by rotating the connection beam (3), the hinge mounting stand (2), the backward mounting stand (4), the forward mounting stand (4), and the connection beam (3) return to the tow beginning point to tow a newly-entering train.
    • 本发明涉及一种在铁路陡坡段内围绕铁路陡坡部分牵引火车的装置,该铁路的陡坡部分具有陡峭的向上斜坡,以在连接到 火车进入陡坡段时,列车能顺利通过陡坡段。 在铁路陡坡部分牵引火车的装置包括:安装在向上陡坡部分中的第一辅助轨道(1a)和第二辅助轨道(1b); 铰链安装架(2)和沿着第一辅助轨道(1a)在陡坡部分中移动的向后安装架(4); 沿着第二辅助轨道(1b)沿陡坡段移动的前安装架(5); 和连接梁(3)。 在牵引起点,铰链安装架(2),后方安装架(4)和前安装架(4)中的每一个在沿着第一辅助件的向上陡坡部分移动的同时牵引列车(200) 轨道(1a)和第二辅助轨道(1b),而连接梁(3)通过与待连接到列车(200)的主轨道(100)相交而布置。 在牵引终点中,在通过旋转连接梁(3),铰链安装台(2),后安装支架(4),前安装支架(4)和连接件 梁(3)返回到牵引起点,拖曳新进的火车。