会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明公开
    • Skew adjustment mechanism for a window covering
    • Vorrichtung zur Einstellung derSchrägstellungeiner Fensterabdeckung
    • EP2740878A3
    • 2016-05-18
    • EP13195733.4
    • 2013-12-04
    • Hunter Douglas Inc.
    • Anderson, RichardHaarer, Steven
    • E06B9/322E06B9/262E06B9/388E06B9/24
    • E06B9/322A47H3/10E06B9/262E06B9/388E06B2009/2441E06B2009/2625E06B2009/2627E06B2009/3222E06B2009/3225Y10T16/372
    • A skew adjustment method and apparatus for adjusting the skewed condition of a movable rail of a window covering in which the movable rail is supported by lift cords wrapped around spools. A drive train disconnecting mechanism is used to disconnect a first spool from a second spool, the first spool is rotated relative to the second spool, thereby changing the length of the first lift cord relative to the second lift cord until the movable rail is in the desired position; and then the first and second spools are reconnected so the first and second spools rotate together. An end cap may be used to enable multiple disassemblies and reassemblies of the end cap to access the skew adjustment mechanism. In one embodiment, there are two movable rails, and the lift cords for both movable rails extend through the same rout holes in the covering. Disconnecting the first spool from the second spool may activate a mechanism that prevents the second spool from rotating.
    • 一种歪斜调节方法和装置,用于调节窗帘的活动导轨的倾斜状态,其中活动导轨由缠绕在卷轴上的提升绳支撑。 驱动列车断开机构用于将第一卷轴与第二卷轴断开,第一卷轴相对于第二卷轴旋转,从而相对于第二提升索改变第一提升索的长度,直到可移动导轨处于 所期望的职位; 然后第一和第二卷轴重新连接,使得第一和第二卷轴一起旋转。 可以使用端盖来实现端盖的多个拆卸和重新组装以接近偏斜调节机构。 在一个实施例中,存在两个活动导轨,并且用于两个活动导轨的提升帘线延伸穿过覆盖物中相同的通孔。 将第一卷轴与第二卷轴断开可以启动防止第二卷轴旋转的机构。
    • 6. 发明公开
    • Skew adjustment mechanism for a window covering
    • 一种用于调整相对于另一拉绳的有效长度,以及窗覆盖物具有装置用于调节的倾斜方法
    • EP2740878A2
    • 2014-06-11
    • EP13195733.4
    • 2013-12-04
    • Hunter Douglas Inc.
    • Anderson, RichardHaarer, Steven
    • E06B9/322
    • E06B9/322A47H3/10E06B9/262E06B9/388E06B2009/2441E06B2009/2625E06B2009/2627E06B2009/3222E06B2009/3225Y10T16/372
    • A skew adjustment method and apparatus for adjusting the skewed condition of a movable rail of a window covering in which the movable rail is supported by lift cords wrapped around spools. A drive train disconnecting mechanism is used to disconnect a first spool from a second spool, the first spool is rotated relative to the second spool, thereby changing the length of the first lift cord relative to the second lift cord until the movable rail is in the desired position; and then the first and second spools are reconnected so the first and second spools rotate together. An end cap may be used to enable multiple disassemblies and reassemblies of the end cap to access the skew adjustment mechanism. In one embodiment, there are two movable rails, and the lift cords for both movable rails extend through the same rout holes in the covering. Disconnecting the first spool from the second spool may activate a mechanism that prevents the second spool from rotating.
    • 用于调节可动轨由围绕线轴缠绕提升绳支承的窗覆盖物的可动导轨的倾斜条件A偏斜调整方法和装置。 动力传动系统断开机构被用来从一第二卷轴断开的第一阀芯,该第一阀芯能够相对于所述第二卷轴转动,从而改变第一拉绳相对的长度与所述第二升降绳直到可动导轨在 期望中的位置; 然后将第一和第二线轴重新连接到所述第一和第二卷轴一起旋转。 端盖可被用于使多个反汇编和端盖的reassemblies访问偏斜调整机构。 在一个,实施例中有两个可移动的导轨,和用于这两个可动轨道提升绳通过在覆盖相同击溃的孔延伸。 断开所述第二阀芯的第一阀柱可以激活机制确实从旋转阻止第二卷轴上。