会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • SUPPLY CONSUMPTION OPTIMIZATION AND MULTIPLE COMPONENT UTILITZATION
    • 供应消费优化和多元组件利用
    • US20090222312A1
    • 2009-09-03
    • US12468203
    • 2009-05-19
    • Alfred T. DegbotseRobert J. MilneRobert A. Orzell
    • Alfred T. DegbotseRobert J. MilneRobert A. Orzell
    • G06Q10/00G06F19/00
    • G06Q10/04G06Q10/087
    • The invention disclosed here is a method for achieving simultaneous consideration of multiple independent dates associated with a single demand. The method iterates through the demands to match the demands with the supply quantities respecting demand priorities which vary over time and demand quantities which may perish over time. One embodiment of the invention allocates demand to supply through an iterative process beginning with earlier demand requirement dates and concluding with later demands which may preempt supply from earlier demands depending upon their relative priorities. An additional embodiment transforms the demands to create multiple demand records, each having an associated priority, such that a single original demand record is transformed into a plurality of related demand records, each having an associated priority. The component supply quantities are accumulated into period ending inventories. The method matches the multiple demand records (in priority sequence) to the period ending inventories.
    • 这里公开的发明是用于实现与单个需求相关联的多个独立日期的同时考虑的方法。 该方法迭代了需求,以满足需求优先级的供应量和随时间变化的需求量以及可能随时间而灭亡的需求量。 本发明的一个实施例通过从先前的需求要求日期开始的迭代过程来分配需求,并且以随后的需求结束,这些需求可以根据其相对优先级抢先提供更多需求。 另外的实施例转换需求以创建多个需求记录,每个需求记录具有相关联的优先级,使得单个原始需求记录被转换成多个相关需求记录,每个相关需求记录具有相关联的优先级。 部件供应量累计到期末存货。 该方法将多个需求记录(优先顺序)与结束库存期间相匹配。
    • 4. 发明授权
    • Supply consumption optimization and multiple component utilization
    • 供应消耗优化和多部件利用
    • US07734365B2
    • 2010-06-08
    • US12468203
    • 2009-05-19
    • Alfred T. DegbotseRobert J. MilneRobert A. Orzell
    • Alfred T. DegbotseRobert J. MilneRobert A. Orzell
    • G06F19/00
    • G06Q10/04G06Q10/087
    • The invention disclosed here is a method for achieving simultaneous consideration of multiple independent dates associated with a single demand. The method iterates through the demands to match the demands with the supply quantities respecting demand priorities which vary over time and demand quantities which may perish over time. One embodiment of the invention allocates demand to supply through an iterative process beginning with earlier demand requirement dates and concluding with later demands which may preempt supply from earlier demands depending upon their relative priorities. An additional embodiment transforms the demands to create multiple demand records, each having an associated priority, such that a single original demand record is transformed into a plurality of related demand records, each having an associated priority. The component supply quantities are accumulated into period ending inventories. The method matches the multiple demand records (in priority sequence) to the period ending inventories.
    • 这里公开的发明是用于实现与单个需求相关联的多个独立日期的同时考虑的方法。 该方法迭代了需求,以满足需求优先级的供应量和随时间变化的需求量以及可能随时间而灭亡的需求量。 本发明的一个实施例通过从先前的需求要求日期开始的迭代过程来分配需求,并且以随后的需求结束,这些需求可以根据其相对优先级抢先提供更多需求。 另外的实施例转换需求以创建多个需求记录,每个需求记录具有相关联的优先级,使得单个原始需求记录被转换成多个相关需求记录,每个相关需求记录具有相关联的优先级。 部件供应量累计到期末存货。 该方法将多个需求记录(优先顺序)与结束库存期间相匹配。
    • 5. 发明授权
    • Supply consumption optimization and multiple component utilization
    • 供应消耗优化和多部件利用
    • US07590463B2
    • 2009-09-15
    • US11278819
    • 2006-04-06
    • Alfred T. DegbotseRobert J. MilneRobert A. Orzell
    • Alfred T. DegbotseRobert J. MilneRobert A. Orzell
    • G06F19/00
    • G06Q10/04G06Q10/087
    • The invention disclosed here is a method for achieving simultaneous consideration of multiple independent dates associated with a single demand. The method iterates through the demands to match the demands with the supply quantities respecting demand priorities which vary over time and demand quantities which may perish over time. One embodiment of the invention allocates demand to supply through an iterative process beginning with earlier demand requirement dates and concluding with later demands which may preempt supply from earlier demands depending upon their relative priorities. An additional embodiment transforms the demands to create multiple demand records, each having an associated priority, such that a single original demand record is transformed into a plurality of related demand records, each having an associated priority. The component supply quantities are accumulated into period ending inventories. The method matches the multiple demand records (in priority sequence) to the period ending inventories.
    • 这里公开的发明是用于实现与单个需求相关联的多个独立日期的同时考虑的方法。 该方法迭代了需求,以满足需求优先级的供应量和随时间变化的需求量以及可能随时间而灭亡的需求量。 本发明的一个实施例通过从先前的需求要求日期开始的迭代过程来分配需求,并且以随后的需求结束,这些需求可以根据其相对优先级抢先提供更多需求。 另外的实施例转换需求以创建多个需求记录,每个需求记录具有相关联的优先级,使得单个原始需求记录被转换成多个相关需求记录,每个相关需求记录具有相关联的优先级。 部件供应量累计到期末存货。 该方法将多个需求记录(优先顺序)与结束库存期间相匹配。