会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明授权
    • Battery management system and method for synchronizing voltage and current of battery
    • 电池管理系统和电池同步电压和电流的方法
    • US09147909B2
    • 2015-09-29
    • US13540573
    • 2012-07-02
    • Se-Sub Sim
    • Se-Sub Sim
    • G01R31/00H01M10/42H01M10/48G01R31/36
    • H01M10/425G01R31/3624G01R31/3658H01M10/48H01M10/482H01M10/488H01M2010/4278
    • A controller of a power storage system includes a voltage measuring device configured to be electrically coupled to at least one cell and to generate first voltage data, the first voltage data comprising a first voltage value and a first voltage measurement time of a voltage of the at least one cell, and a current measuring device configured to be electrically coupled to the at least one cell and to generate first current data, the first current data comprising a first current value and a first current measurement time of a current through the at least one cell, the first voltage measurement time corresponding to the first current measurement time in a first measuring period, a battery management system configured to generate a clock signal transmitted to the voltage measuring device and the current measuring device to synchronize the first voltage data and the first current data in a first transmission period of the first measuring period.
    • 电力存储系统的控制器包括电压测量装置,其被配置为电耦合到至少一个电池并且产生第一电压数据,所述第一电压数据包括第一电压值和第一电压测量时间 至少一个单元以及电流测量装置,其被配置为电耦合到所述至少一个单元并且产生第一电流数据,所述第一电流数据包括通过所述至少一个电流的电流的第一电流值和第一电流测量时间 电池,第一电压测量时间,其对应于在第一测量周期中的第一电流测量时间;电池管理系统,被配置为产生传输到所述电压测量装置的时钟信号和所述电流测量装置,以使所述第一电压数据与所述第一电压数据同步; 在第一测量周期的第一传输周期中的当前数据。