会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Systems and methods for scheduling contact center agents
    • 调度联络中心代理的系统和方法
    • US08705723B2
    • 2014-04-22
    • US12684027
    • 2010-01-07
    • Jason FamaUri PelegSimon ShvartsMike BourkeJames Gordon NiesVinod Prabhu
    • Jason FamaUri PelegSimon ShvartsMike BourkeJames Gordon NiesVinod Prabhu
    • H04M3/00
    • H04M3/5237G06Q10/103H04M3/5233
    • Systems and methods for scheduling workforces are provided. In this regard, a representative method includes: generating a forecast requirement related to a volume of work to be handled by a first workforce and a second workforce, wherein the second workforce is remote from the first workforce; generating work schedules for personnel of the second workforce based on the forecast requirement and skills of the personnel of the second workforce; receiving information corresponding to the work schedules and the skills of the personnel of the second workforce that share work with the first workforce, wherein the work schedules comprise activities; correlating the skills contained in the information with skills that are to be used for scheduling personnel of the first workforce; correlating the activities contained in the information with activities that are to be used for scheduling the personnel of the first workforce; and generating work schedules for the personnel of the first workforce based, at least in part, on a correlation between the skills of the personnel of the second workforce and the first workforce and a correlation between the activities of the personnel of the second workforce and the first workforce.
    • 提供了安排员工队伍的系统和方法。 在这方面,一种代表性的方法包括:产生与由第一劳动者和第二劳动力处理的工作量有关的预测要求,其中第二劳动力远离第一劳动力; 根据第二劳动力人员的预测要求和技能,为第二劳动者人员制定工作时间表; 接收与工作时间表相对应的信息和与第一劳动力共享工作的第二劳动力人员的技能,其中工作时间表包括活动; 将信息中包含的技能与将用于安排第一劳动力人员的技能相关联; 将信息中包含的活动与用于安排第一劳动力人员的活动相关联; 并且至少部分地基于第二劳动力人员的技能与第一劳动力之间的相关性以及第二劳动力人员的活动与第二劳动力的人员之间的相互关系,为第一劳动者的人员创造工作时间表 第一劳动力
    • 2. 发明授权
    • Systems and methods for data synchronization in a customer center
    • 在客户中心进行数据同步的系统和方法
    • US08331548B2
    • 2012-12-11
    • US12891620
    • 2010-09-27
    • Rajan GuptaKurt RushUri Peleg
    • Rajan GuptaKurt RushUri Peleg
    • H04M3/00
    • H04M3/5183
    • A synchronization manager comprises an instruction execution system. The instruction execution system is configured to identify an initial master application of a plurality of workforce applications that are in communication with a contact center, identify remaining ones of the workforce applications as slave applications, determine a substitute master application hierarchy by prioritizing the slave applications, monitor the initial master application to detect changes to user data, and if changes to the user data in the initial master application are detected, update corresponding user data in the slave applications with the changes to the user data in the initial master application. The instruction execution system is further configured to, if the initial master application is unavailable, identify one of the slave applications as a substitute master application based on the prioritization of the slave applications in the substitute master application hierarchy, and monitor the substitute master application to detect changes to the user data.
    • 同步管理器包括指令执行系统。 指令执行系统被配置为识别与联络中心通信的多个劳动力应用程序的初始主应用程序,将剩余的劳动力应用程序识别为从应用程序,通过优先化从属应用程序来确定替代主应用程序层次结构, 监视初始主应用程序以检测用户数据的更改,如果检测到初始主应用程序中用户数据的更改,则在初始主应用程序中更改从属应用程序中的用户数据更改相应的用户数据。 指令执行系统还被配置为:如果初始主应用不可用,则基于替代主应用层次中的从应用的优先级,将其中一个从应用识别为替代主应用,并将替代主应用监视到 检测用户数据的更改。
    • 6. 发明授权
    • Method for cutting natural and/or man-made diamonds
    • 切割天然和/或人造钻石的方法
    • US06892720B2
    • 2005-05-17
    • US10413898
    • 2003-04-15
    • Michael SchachterUri Peleg
    • Michael SchachterUri Peleg
    • A44C17/00B28D5/00
    • A44C17/001
    • A method for producing a diamond includes forming a table lying in a table plane; forming crown facets that are oriented at an angle of between 26° and 35° relative to the table plane; forming upper pavilion (UP) facets below the crown facets at an angle of between 45° and 80° relative to a girdle plane lying between bottoms of the crown facets and tops of the UP facets; and forming a set of lower pavilion (LP) facets between bottoms of the UP facets and the culet at an angle of between 38° and 44° relative to the girdle plane. The UP and LP facets form a rib line positioned between one-fifth and four-fifths the distance between the girdle plane and the culet, such that the UP facets extend between 20% and 80% of the distance between the girdle plane and the culet.
    • 一种金刚石的制造方法,其特征在于, 形成相对于台面以26°至35°的角度定向的冠面; 在相对于位于冠面的底部和UP面的顶部之间的腰带平面之间以45°和80°之间的角度在冠面下方形成上部亭(UP)小面; 并且在UP面的底部和底部之间以相对于腰围平面38°至44°的角度形成一组下部亭(LP)小面。 UP和LP刻面形成肋条线,其位于腰带平面和底尖之间的距离的五分之一到四分之五之间,使得UP面延伸在带状平面和底部之间的距离的20%至80%之间 。
    • 7. 发明申请
    • SYSTEMS AND METHODS FOR SCHEDULING CONTACT CENTER AGENTS
    • 调度联系中心代理的系统和方法
    • US20100114644A1
    • 2010-05-06
    • US12684027
    • 2010-01-07
    • Jason FamaUri PelegSimon ShvartsMike BourkeJames Gordon NiesVinod Prabhu
    • Jason FamaUri PelegSimon ShvartsMike BourkeJames Gordon NiesVinod Prabhu
    • G06Q10/00
    • H04M3/5237G06Q10/103H04M3/5233
    • Systems and methods for scheduling workforces are provided. In this regard, a representative method includes: generating a forecast requirement related to a volume of work to be handled by a first workforce and a second workforce, wherein the second workforce is remote from the first workforce; generating work schedules for personnel of the second workforce based on the forecast requirement and skills of the personnel of the second workforce; receiving information corresponding to the work schedules and the skills of the personnel of the second workforce that share work with the first workforce, wherein the work schedules comprise activities; correlating the skills contained in the information with skills that are to be used for scheduling personnel of the first workforce; correlating the activities contained in the information with activities that are to be used for scheduling the personnel of the first workforce; and generating work schedules for the personnel of the first workforce based, at least in part, on a correlation between the skills of the personnel of the second workforce and the first workforce and a correlation between the activities of the personnel of the second workforce and the first workforce.
    • 提供了安排员工队伍的系统和方法。 在这方面,一种代表性的方法包括:产生与由第一劳动者和第二劳动力处理的工作量有关的预测要求,其中第二劳动力远离第一劳动力; 根据第二劳动力人员的预测要求和技能,为第二劳动者人员制定工作时间表; 接收与工作时间表相对应的信息和与第一劳动力共享工作的第二劳动力人员的技能,其中工作时间表包括活动; 将信息中包含的技能与将用于安排第一劳动力人员的技能相关联; 将信息中包含的活动与用于安排第一劳动力人员的活动相关联; 并且至少部分地基于第二劳动力人员的技能与第一劳动力之间的相关性以及第二劳动力人员的活动与第二劳动力的人员之间的相互关系,为第一劳动者的人员创造工作时间表 第一劳动力
    • 9. 发明授权
    • High yield diamond
    • 高产钻石
    • US06615611B1
    • 2003-09-09
    • US09669137
    • 2000-09-26
    • Michael SchachterUri Peleg
    • Michael SchachterUri Peleg
    • A44C1700
    • A44C17/001
    • A high yield diamond and method of producing same. The diamond includes a plurality of main crown facets adjacent a table lying at an angle of between 23° and 40° relative to the table, a girdle, a plurality of upper pavilion facets below the girdle lying at an angle of between 45° and 80° relative to the girdle plane, and a plurality of lower pavilion facets formed between the upper pavilion facets and the culet. The upper pavilion facets extend from between one fifth to four fifths the height of the pavilion. The method is directed to a process for blocking the pavilion of the diamond prior to performing any brillianteering steps.
    • 高产金刚石及其生产方法。 金刚石包括相对于桌子相对于桌子相对于台面相对于23°至40°的角度的多个主冠面,腰带,腰带下方的多个上部亭形面位于45°和80°之间的角度 相对于腰围平面的多个下部亭形面,以及形成在上部亭形面和底部之间的多个下部亭形面。 上部的亭子面从展馆的高度的五分之一到四分之五。 该方法涉及在执行任何辉煌步骤之前阻止钻石亭的过程。