会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • Technique for determining whether to reestablish fast rerouted primary tunnels based on backup tunnel path quality feedback
    • 基于备份隧道路径质量反馈确定是否重新建立快速重新路由的主隧道的技术
    • US20070183317A1
    • 2007-08-09
    • US11347781
    • 2006-02-03
    • Jean-Philippe VasseurAlton LoAnna Charny
    • Jean-Philippe VasseurAlton LoAnna Charny
    • H04J3/14
    • H04L45/28H04J3/14H04L12/4633H04L45/22H04L45/50H04L45/60
    • A technique dynamically determines whether to reestablish a Fast Rerouted primary tunnel based on path quality feedback of a utilized backup tunnel in a computer network. According to the novel technique, a head-end node establishes a primary tunnel to a destination, and a point of local repair (PLR) node along the primary tunnel establishes a backup tunnel around one or more protected network elements of the primary tunnel, e.g., for Fast Reroute protection. Once one of the protected network elements fail, the PLR node “Fast Reroutes,” i.e., diverts, the traffic received on the primary tunnel onto the backup tunnel, and sends notification of backup tunnel path quality (e.g., with one or more metrics) to the head-end node. The head-end node then analyzes the path quality metrics of the backup tunnel to determine whether to utilize the backup tunnel or reestablish a new primary tunnel.
    • 一种技术基于计算机网络中利用的备用隧道的路径质量反馈来动态地确定是否重新建立快速重新路由的主隧道。 根据新技术,头端节点建立到目的地的主要隧道,沿主隧道的本地修复(PLR)节点建立围绕主隧道的一个或多个受保护网元的备用隧道,例如 ,用于快速重路由保护。 一旦受保护的网络元件发生故障,PLR节点“快速重路由”(即将主隧道上接收到的流量转移到备份隧道上),并发送备份隧道路径质量的通知(例如,使用一个或多个度量) 到头端节点。 然后,头端节点分析备份隧道的路径质量度量,以确定是否利用备份隧道或重新建立新的主隧道。
    • 8. 发明申请
    • TECHNIQUE FOR DETERMINING WHETHER TO REESTABLISH FAST REROUTED PRIMARY TUNNELS BASED ON BACKUP TUNNEL PATH QUALITY FEEDBACK
    • 用于确定基于备用隧道路径质量反馈的快速解决的主要隧道的技术
    • US20120044801A1
    • 2012-02-23
    • US13286789
    • 2011-11-01
    • Jean-Philippe VasseurAlton LoAnna Charny
    • Jean-Philippe VasseurAlton LoAnna Charny
    • H04L12/26
    • H04L45/28H04J3/14H04L12/4633H04L45/22H04L45/50H04L45/60
    • In one embodiment, a primary tunnel is established from a head-end node to a destination along a path including one or more protected network elements for which a fast reroute path is available to pass traffic around the one or more network elements in the event of their failure. A first path quality measures path quality prior to failure of the one or more protected network elements. A second path quality measures path quality subsequent to failure of the one or more protected network elements, while the fast reroute path is being used to pass traffic of the primary tunnel. A determination is made whether to reestablish the primary tunnel over a new path that does not include the one or more failed protected network elements, or to continue to utilize the path with the fast reroute path, in response to a difference between the first path quality and the second path quality.
    • 在一个实施例中,沿着包括一个或多个受保护网络的路径的头端节点到目的地建立主隧道,对于该隧道,快速重路由路径可用于在一个或多个网络元件周围传送流量 他们的失败 第一路径质量在一个或多个受保护的网络元件故障之前测量路径质量。 第二路径质量测量在一个或多个受保护网络元件故障之后的路径质量,而快速重路由路径被用于传递主隧道的业务。 确定是否通过不包括一个或多个失败的受保护网络元件的新路径重新建立主隧道,或者响应于第一路径质量之间的差异来继续利用具有快速重路由路径的路径 和第二条路径质量。