    • 1. 发明授权
    • Method for optimizing foundry capacity
    • 优化铸造能力的方法
    • US07103436B2
    • 2006-09-05
    • US10707976
    • 2004-01-29
    • Brian T. DentonRobert J. MilneRobert A. OrzellSatyadeep VajjalaJacqueline N. Ward
    • Brian T. DentonRobert J. MilneRobert A. OrzellSatyadeep VajjalaJacqueline N. Ward
    • G06F19/00
    • G06Q10/00G06Q10/04G06Q30/00
    • The invention provides a method and system for determining a production plan that includes a first step that determines the minimum number of manufacturing starts that are required to meet contractual obligations; and a second step which determines a production plan satisfying the minimum manufacturing starts together with other customer demands. More specifically, the invention presents a method of allocating production starts (e.g., wafer starts) in a manufacturing facility (e.g., wafer foundry) using a linear programming production planning system which performs a first stage of linear programming to satisfy only contractually mandated minimum production starts constraints followed by a second stage of linear programming to satisfy the additional constraints, once the minimum starts constraints are satisfied.
    • 本发明提供了一种用于确定生产计划的方法和系统,其包括确定满足合同义务所需的制造开始的最小数量的第一步骤; 并且确定满足最小制造的生产计划的第二步骤与其他客户需求一起开始。 更具体地,本发明提出了一种使用线性规划生产计划系统在制造设施(例如,晶圆代工厂)中分配生产开始(例如,晶片启动)的方法,线性规划生产计划系统执行线性规划的第一阶段以仅满足合同规定的最小生产 一旦满足最小启动约束,则开始约束,随后是线性规划的第二阶段以满足附加约束。
    • 2. 发明申请
    • A METHOD FOR OPTIMIZING FOUNDRY CAPACITY
    • 一种优化基础能力的方法
    • US20050171625A1
    • 2005-08-04
    • US10707976
    • 2004-01-29
    • Brian DentonRobert MilneRobert OrzellSatyadeep VajjalaJacqueline Ward
    • Brian DentonRobert MilneRobert OrzellSatyadeep VajjalaJacqueline Ward
    • G06F19/00
    • G06Q10/00G06Q10/04G06Q30/00
    • The invention provides a method and system for determining a production plan that includes a first step that determines the minimum number of manufacturing starts that are required to meet contractual obligations; and a second step which determines a production plan satisfying the minimum manufacturing starts together with other customer demands. More specifically, the invention presents a method of allocating production starts (e.g., wafer starts) in a manufacturing facility (e.g., wafer foundry) using a linear programming production planning system which performs a first stage of linear programming to satisfy only contractually mandated minimum production starts constraints followed by a second stage of linear programming to satisfy the additional constraints, once the minimum starts constraints are satisfied.
    • 本发明提供了一种用于确定生产计划的方法和系统,其包括确定满足合同义务所需的制造开始的最小数量的第一步骤; 并且确定满足最小制造的生产计划的第二步骤与其他客户需求一起开始。 更具体地,本发明提出了一种使用线性规划生产计划系统在制造设施(例如,晶圆代工厂)中分配生产开始(例如,晶片启动)的方法,线性规划生产计划系统执行线性规划的第一阶段以仅满足合同规定的最小生产 一旦满足最小启动约束,则开始约束,随后是线性规划的第二阶段以满足附加约束。
    • 3. 发明申请
    • PRODUCTION MANAGEMENT WITH MULTI-TYPE KANBAN MODELING
    • 多种型号的生产管理建模
    • US20120136758A1
    • 2012-05-31
    • US12957003
    • 2010-11-30
    • Manuel ParenteUlrich B. SchimpelSatyadeep Vajjala
    • Manuel ParenteUlrich B. SchimpelSatyadeep Vajjala
    • G06Q10/00
    • G06Q10/087
    • Setting a plurality of reorder points for a plurality of products, the plurality of reorder points including a first reorder point and a second reorder point, the second reorder point greater than the first reorder point. Determining for one or more products, issuing one or more normal kanbans and one or more build ahead kanbans over one or more periods of time based on inventory levels and product demand. Approving for production in the current time period the one or more normal kanbans issued for the current time period. Determining if excess capacity exists to produce additional kanbans and approving for production in the current time period one or more of the build ahead kanbans in response to determining that excess capacity exists.
    • 为多个产品设置多个重新排序点,所述多个重排序点包括第一重排序点和第二重排序点,第二重排序点大于第一重排序点。 确定一个或多个产品,根据库存水平和产品需求,在一个或多个时间段内发布一个或多个正常的kanbans和一个或多个建立前进的kanbans。 批准在当前时间段内生产的一个或多个正常的甘露当前时间。 确定过剩产能是否存在以产生额外的甘蔗,并在当前时间段内批准生产,一个或多个建设前进的甘蔗响应于确定过剩产能存在。