会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Method for optimizing mining production
    • US10995615B2
    • 2021-05-04
    • US16026388
    • 2018-07-03
    • Caterpillar Inc.
    • Kevin E. Gates
    • E21C41/26G06Q50/02
    • A system for mining site production planning includes a control system configured to specify a problem-solving technique and associated optimization problem for a mining site by setting production goals and priorities for each of loading tools, processors, production arcs, and materials of the mining site, sorting the production arcs in an order based on travel distances, modifying the order based on the production goals for each of the loading tools, processors, production arcs, and/or materials, and further modifying the order based on set priorities for the loading tools, processors, production arcs, and/or materials. In addition, target values are set for each of the loading tools, processors, and production arcs according to their order of the sorted production arcs. The control system is further configured to solve the optimization problem to produce production values for each of the loading tools, processors, and production arcs based on the target values.