会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明申请
    • Method and Apparatus for System Control of a Central Processing Unit (CPU) Maximum Power Detector
    • 中央处理器(CPU)最大功率检测器的系统控制方法和装置
    • US20160231802A1
    • 2016-08-11
    • US14619727
    • 2015-02-11
    • Dell Products, LP
    • John E. JenneShawn J. DubeSandor Farkas
    • G06F1/32G06F1/26
    • G06F1/3243G06F1/263G06F1/30G06F1/3206G06F1/3212
    • A method and apparatus for system control of a central processing unit (CPU) maximum power detector are provided. in accordance with at least one embodiment, a decision is made as to whether a response of a maximum power detector of the CPU is to be altered. When the response is to be altered, a modified input level is provided to the maximum power detector to alter the response. As an example, the modified input level can prevent the maximum power detector from triggering a power throttling function. When the response is not to be altered, an existing input level for the maximum power detector is maintained. In accordance with at least one embodiment, an apparatus or information handling system can comprise a voltage regulator (VR), a current sensor, a CPU comprising a maximum power detector, and a digital to analog converter (DAC).
    • 提供了一种用于中央处理单元(CPU)最大功率检测器的系统控制的方法和装置。 根据至少一个实施例,做出关于CPU的最大功率检测器的响应是否被改变的决定。 当响应被改变时,修改的输入电平被提供给最大功率检测器以改变响应。 作为示例,修改的输入电平可以防止最大功率检测器触发功率节流功能。 当不改变响应时,维持最大功率检测器的现有输入电平。 根据至少一个实施例,装置或信息处理系统可以包括电压调节器(VR),电流传感器,包括最大功率检测器的CPU和数模转换器(DAC)。
    • 6. 发明授权
    • Power budgeting in an information handling system
    • US10459733B2
    • 2019-10-29
    • US15880058
    • 2018-01-25
    • DELL PRODUCTS, LP
    • John E. JenneKyle E. Cross
    • G06F9/44G06F1/32G06F9/4401G06F1/3206
    • A halt event separates a boot up operation from a run time operation. A controller grants a request from a baseboard management controller for an electrical power associated with a boot-up operation. As the baseboard management controller completes the boot-up operation (such as a power on self-test), the baseboard management controller predicts the electrical power that is required for a run time operation (e.g., executing an operating system). The baseboard management controller is then required or forced to submit a subsequent request for the additional electrical power that is required for the run time operation. The controller compares the electrical power predicted for the run time operation to a power availability from a power supply (such as a safe or maximum operating condition). If the power supply can provide the electrical power predicted to be required during the run time operation, then the controller may permit or authorize a transition from the boot up operation to the run time operation. However, if the power supply cannot provide the electrical power predicted to be required during the run time operation, then the controller denies the run time operation.
    • 10. 发明申请
    • Date Adjusted Power Budgeting for an Information Handling System
    • 信息处理系统的日期调整功率预算
    • US20140380069A1
    • 2014-12-25
    • US13924988
    • 2013-06-24
    • Dell Products, LP
    • Stuart Allen BerkeJohn E. Jenne
    • G06F1/32
    • G06F1/32
    • An information handling system determines a system configuration including a hardware module, and determines an adjusted power budget for the hardware module. The adjusted power budget is based on a calculation including a difference between a date code read from the hardware module and a baseline date, a baseline power budget, a power reduction period and a power reduction interval. The calculation may optionally include a risk factor. In alternate embodiments, an adjusted power budget for a hardware module may be calculated by an order processing system for information handling systems, or by a planning tool for a data center which contains information handling systems.
    • 信息处理系统确定包括硬件模块的系统配置,并且确定用于硬件模块的经调整的功率预算。 经调整的功率预算基于包括从硬件模块读取的日期代码与基线日期,基准功率预算,功率降低周期和功率降低间隔之间的差异的计算。 计算可以可选地包括风险因素。 在替代实施例中,用于硬件模块的经调整的功率预算可以由信息处理系统的订单处理系统或包含信息处理系统的数据中心的规划工具来计算。