热词
    • 5. 发明申请
    • RISK ASSESSMENT FOR DRILLING AND WELL COMPLETION OPERATIONS
    • 钻井和完井操作的风险评估
    • US20160260036A1
    • 2016-09-08
    • US15062164
    • 2016-03-06
    • The Hartford Steam Boiler Inspection and Insurance Company
    • Richard B. Jones
    • G06Q10/06
    • G06Q50/02G06Q10/0635G16C10/00
    • A method, apparatus and system is provided for assessing risk for well completion, comprising: obtaining, using an input interface, a Below Rotary Table hours and a plurality of well-field parameters for one or more planned runs, determining, using at least one processor, one or more non-productive time values that correspond to the one or more planned runs based upon the well-field parameters, developing, using at least one processor, a non-productive time distribution and a Below Rotary Table distribution via one or more Monte Carlo trials; and outputting, using a graphic display, a risk transfer model results based on a total BRT hours from the Below Rotary Table and the non-productive time distribution produced from the one or more Monte Carlo trials.
    • 提供了一种用于评估井完井的风险的方法,装置和系统,包括:使用输入界面获得一个或多个计划运行的下旋转小时数和多个井场参数,确定使用至少一个 处理器,基于井场参数对应于一个或多个计划的运行的一个或多个非生产时间值,使用至少一个处理器,经由一个或多个处理器开发非生产时间分布和下转动表分布, 更多的蒙特卡洛试验; 并且使用图形显示器输出基于从下表旋转表中的总BRT小时的风险转移模型结果和从一个或多个蒙特卡洛试验产生的非生产时间分布。