    • ALLOCATION OF ENERGY PRODUCTION CHANGES TO MEET DEMAND CHANGES
    • 能源生产变化分配达到需求变化
    • US20160109895A1
    • 2016-04-21
    • US14515706
    • 2014-10-16
    • Honeywell International Inc.
    • Zdenek Schindler
    • G05F1/66G05B13/04
    • G06Q50/06G05B13/048G05F1/66G06Q10/06
    • A computer implemented method optimizes a utility plant having multiple devices to convert input energy into output energy for a building. The method includes dividing a utility plant scheduling interval into several control intervals and for each control interval, obtaining a difference between a desired and a measured in-building condition controlled by output power from the utility plant, obtaining current values of multiple factors that influence operation of the utility plant, determining a new power demand of the building expected to decrease the difference, and finding set points for the multiple devices that satisfy the new power demand, take into account response times of the devices and their capacities, and optimize utility plant operation costs.
    • 计算机实现的方法优化具有多个装置的实用工厂,以将输入能量转换成建筑物的输出能量。 该方法包括将公用事业设备调度间隔划分成若干控制间隔,并且对于每个控制间隔,获得由公用设施的输出功率控制的期望和测量的建筑内状况之间的差异,获得影响操作的多个因素的当前值 确定建筑物的新电力需求预期减少差异,并且为满足新电力需求的多个设备寻找设定点,考虑设备的响应时间及其能力,并优化实用工厂 运营成本