热词
    • 4. 发明申请
    • SPOT WELDING METHOD OF HIGH-STRENGTH STEEL SHEETS EXCELLENT IN JOINT STRENGTH
    • 高强度钢点焊点焊接方法
    • US20150174690A1
    • 2015-06-25
    • US14417075
    • 2012-09-24
    • NIPPON STEEL & SUMITOMO METAL CORPORATION
    • Seiji FurusakoHatsuhiko OikawaYasunobu Miyazaki
    • B23K11/11B23K11/24B23K11/16
    • B23K11/115B23K11/16B23K11/241B23K2101/04B23K2103/04
    • When two high-strength steel sheets (1A, 1B) whose sheet thickness ratio={the sum of sheet thicknesses of the steel sheets}/{the sheet thickness of the thinner steel sheet (when they have the same thickness, the sheet thickness per one sheet)} is within a range of not less than 2 nor more than 5 and which both have tensile strength of not less than 780 MPa nor more than 1850 MPa are stacked to be subjected to resistance spot welding, a first welding step being pre-welding with a pressurizing force P1 kN and a welding current I1 kA and a second welding step being main welding with a pressurizing force P2 kN and a welding current I2 kA are performed, the pressurizing forces P1, P2 are set to a fixed pressurizing force P=P1=P2 all through the first welding step and the second welding step and are set within a range expressed by {0.5≦P≦3.0t(1/3)}, where t mm is an average sheet thickness of the steel sheets (1A, 1B), the welding current I1 is set within a range of not less than 30% nor more than 90% of the welding current I2, and the second welding step is started within 0.1 s after the first welding step is finished.
    • 当两片高强度钢板(1A,1B)的板厚比= {钢板的板厚的总和} / {薄钢板的板厚(当它们具有相同的厚度时, 一片)}在不小于2且不大于5的范围内,并且其拉伸强度不低于780MPa并且不大于1850MPa都被堆叠以进行电阻点焊,第一焊接步骤是预先 以加压力P1kN和焊接电流I1 kA进行焊接,第二焊接步骤为加压力P2 kN和焊接电流I2 kA的主要焊接,加压力P1,P2设定为固定的加压力 P = P1 = P2全部通过第一焊接步骤和第二焊接步骤,并设置在由{0.5≦̸ P≦̸ 3.0t(1/3)}表示的范围内,其中t mm是钢的平均板厚 片(1A,1B)中,焊接电流I1设定在不小于30%的范围内 不超过90%的焊接电流I2,第二焊接步骤在第一焊接步骤完成后的0.1s内开始。