会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明申请
    • PHICH RESERVED RESOURCES WITH CC SPECIFIC TDD UL/DL CONFIGURATIONS
    • 具有CC SPECIFIC TDD UL / DL配置的PHICH RESERVED RESOURCES
    • US20140092840A1
    • 2014-04-03
    • US14063667
    • 2013-10-25
    • Renesas Mobile Corporation
    • Erlin ZENGJing HANWei BAIHaiming WANG
    • H04L5/00
    • H04L5/0094H04L1/1861H04L5/001H04L5/0053H04L5/0055H04L5/1469H04W28/04H04W28/26H04W72/12
    • If an allocated radio resource in a 2nd component carrier/CC, which is cross scheduled from a 1st CC and the 1st and 2nd CCs have different 1st and 2nd UL/DL subframe configurations, then it is checked if a mapped subframe for acknowledging data that is mapped from the allocated radio resource according to the 2nd UL/DL configuration is a subframe for acknowledging data according to the 1st UL/DL configuration. If not, then the UE or NodeB tune their radio to a predefined resource within the mapped subframe in the 1st CC for acknowledging data on the allocated radio resource in the 2nd CC. If yes then the mapping is conventional. Multiple implementations are shown by which the predefined resource is a resource element or physical resource block depending on whether the mapped subframe according to the 1st UL/DL configuration is a PDCCH or a PDSCH, and these may be implicitly or explicitly linked to the allocated resource.
    • 如果从第一CC和第一和第二CC交叉调度的第二分量载波/ CC中的分配无线电资源具有不同的第一和第二UL / DL子帧配置,则检查用于确认数据的映射子帧 根据第二UL / DL配置从所分配的无线电资源映射是根据第一UL / DL配置来确认数据的子帧。 否则,则UE或NodeB将其无线电调谐到第一CC中的映射子帧内的预定义资源,以确认第二CC中分配的无线电资源上的数据。 如果是,则映射是常规的。 显示了根据第一UL / DL配置的映射子帧是PDCCH还是PDSCH的预定义资源是资源元素或物理资源块的多个实现,并且这些可以隐式地或明确地链接到所分配的资源 。