会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明申请
    • METHOD AND APPARATUS FOR ENABLING CHANNEL AND INTERFERENCE ESTIMATIONS IN MACRO/RRH SYSTEM
    • 用于在MACRO / RRH系统中实现通道和干扰估计的方法和装置
    • US20120207043A1
    • 2012-08-16
    • US13336599
    • 2011-12-23
    • Stefan GeirhoferTingfang JiPeter GaalTao LuoWanshi ChenJuan Montojo
    • Stefan GeirhoferTingfang JiPeter GaalTao LuoWanshi ChenJuan Montojo
    • H04W24/00
    • H04L5/0048H04L5/0023H04L5/0057H04L5/006H04L25/0226
    • Aspects disclosed herein relate to channel and interference estimations in a multiple transmission point environment including an eNB and RRHs. In the disclosed aspects, one or more transmission points can signal to a UE to measure channel state conditions based on a first and a second resource pattern. The UE may receive the signaling and perform interference estimation based at least in part on the first resource pattern, and channel estimation based at least in part on the second resource pattern. The UE may generate a channel state report based on the interference and channel estimations, and transmit the channel state report to a transmission point. The eNB may employ the received channel state report in scheduling one or more resources for use by the UE, and may select or adjust network traffic on the first and the second resource pattern, to affect the resulting channel and interference estimation.
    • 本文公开的方面涉及包括eNB和RRH在内的多传输点环境中的信道和干扰估计。 在所公开的方面中,一个或多个传输点可以向UE发信号,以基于第一和第二资源模式测量信道状态条件。 UE可以至少部分地基于第一资源模式接收信令并执行干扰估计,以及至少部分地基于第二资源模式来进行信道估计。 UE可以基于干扰和信道估计产生信道状态报告,并将信道状态报告发送到传输点。 eNB可以使用所接收的信道状态报告来调度一个或多个资源供UE使用,并且可以选择或调整第一和第二资源模式上的网络流量,以影响所得到的信道和干扰估计。
    • 3. 发明申请
    • Power control with cross-subframe assignment
    • 具有跨子帧分配的功率控制
    • US20110274064A1
    • 2011-11-10
    • US13103843
    • 2011-05-09
    • Tao LuoWanshi ChenJuan MontojoPeter Gaal
    • Tao LuoWanshi ChenJuan MontojoPeter Gaal
    • H04W52/04H04W72/04
    • H04W52/146H04L5/0007H04W52/325
    • A method includes receiving a cross-subframe assignment in a first subframe, targeting a second subframe in which a transmission power control (TPC) command is to be applied. The method may also include adjusting transmit power in accordance with the TPC command during a third subframe, a predefined number of subframes after the first subframe. Another method includes receiving a cross-subframe assignment in a first subframe. The cross-subframe assignment targets a second subframe in which a first TPC command is to be applied. The method may also include receiving a nominal grant in the first subframe that targets an identified subframe to which a second TPC command is to be applied. The method may also include adjusting the transmit power according to the first TPC command, the second TPC command or a function of the first TPC command and the second TPC command during the second subframe or the identified subframe.
    • 一种方法包括在第一子帧中接收跨子帧分配,针对要应用发送功率控制(TPC)命令的第二子帧。 该方法还可以包括在第三子帧期间根据TPC命令调整发射功率,在第一子帧之后调整预定数量的子帧。 另一种方法包括在第一子帧中接收跨子帧分配。 跨子帧分配针对要应用第一TPC命令的第二子帧。 该方法还可以包括在第一子帧中接收目标要应用第二TPC命令的所识别的子帧的标称许可。 该方法还可以包括在第二子帧或所识别的子帧期间根据第一TPC命令,第二TPC命令或第一TPC命令的功能和第二TPC命令调整发射功率。