会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 5. 发明授权
    • Laying and protecting cable into existing covering surfaces
    • 铺设和保护电缆到现有的覆盖表面
    • US09203226B2
    • 2015-12-01
    • US13796391
    • 2013-03-12
    • CertusView Technologies, LLC
    • Daniel Paul Miller
    • F16L1/00H02G9/00E02F3/88E02F5/08E02F5/10E02F5/12H02G1/06E02F5/02
    • H02G9/00E02F3/8816E02F5/02E02F5/08E02F5/10E02F5/101E02F5/12H02G1/06
    • Methods and apparatus for cutting a trench (e.g., for a fiber optic cable or wire conductors) in an existing covering surface (e.g., a road surface), wherein the trench has a depth of approximately 10 to 12 inches and a width of approximately 0.5 to 1.25 inches. Debris from the cut trench is evacuated (e.g., vacuumed) from the trench as the trench is cut. The trench may be backfilled by flowing a non-shrinking composition into at least a portion of the trench and, after hardening of the non-shrinking composition, applying a topping material to a remaining portion of the trench. In one example, the non-shrinking composition is configured to rigidify within one hour of being flowed into the trench, be substantially impermeable thereafter (e.g., having a hydraulic permeability of less than 0.0000001 cm/s upon drying), and be non-compressible and non-expanding.
    • 用于在现有覆盖表面(例如,路面)中切割沟槽(例如,用于光纤电缆或导线导体)的方法和装置,其中沟槽具有约10至12英寸的深度和约0.5的宽度 到1.25英寸 当切割沟槽时,来自切割沟槽的碎屑从沟槽中抽真空(例如抽真空)。 沟槽可以通过将非收缩组合物流入沟槽的至少一部分来回填,并且在非收缩组合物硬化之后,将顶部材料施加到沟槽的剩余部分。 在一个实例中,非收缩组合物被构造成在流入沟槽中的一小时内刚性化,此后基本上不可渗透(例如,在干燥时具有小于0.0000001cm / s的水硬渗透性),并且是不可压缩的 和不扩张。