会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明授权
    • Device for low-pressure casting, a method for filling inert gas in the device, and method for producing a cast
    • 用于低压铸造的装置,在装置中填充惰性气体的方法,以及铸件的制造方法
    • US08191608B2
    • 2012-06-05
    • US12596112
    • 2008-04-08
    • Shinya MizunoYutaka Murata
    • Shinya MizunoYutaka Murata
    • B22D18/04B22D18/08B22D46/00
    • B22D18/04B22D18/08
    • A device for low-pressure casting wherein the stalk or the guiding tube is filled with inert gas by causing the space formed over the molten metal in the pressurizing room to communicate with the stalk or the guiding tube. The device for low-pressure casting (100) wherein molten metal is supplied into a mold through a stalk (8) suspended from a gate for pouring of the mold (7) or through a guiding tube (21) connected to the gate for pouring at one end by pressurizing the molten metal by inert gas, the device including: a room for holding molten metal (1); a pressurizing room (2) to be in communication with the room for holding molten metal through a hole for communication (4), wherein a bottom end of the stalk (8) enters the pressurizing room or an opposite end of the guiding hole is connected to the pressurizing room, and wherein the molten metal is pressurized by inert gas; an on-off valve (5) for opening and shutting the hole for communication; a sensing device (15) for sensing that the space over the molten metal in the pressurizing room communicates with the stalk or the guiding tube; and a device (30) for supplying inert gas to an upper part of the pressurizing room.
    • 一种用于低压铸造的装置,其中通过使形成在加压室中的熔融金属上的空间与杆或引导管连通而将惰性气体填充到惰性气体中。 用于低压铸造的设备(100),其中熔融金属通过悬挂在浇口(7)上的浇口的浇口(8)或通过连接到浇注浇口的引导管(21)供给到模具中 在一端通过惰性气体对熔融金属加压,该装置包括:用于保持熔融金属(1)的空间; 加压室(2),与通过用于连通的孔(4)保持熔融金属的房间连通,其中,所述杆(8)的底端进入所述加压室或所述引导孔的相对端连接 到所述加压室,并且其中所述熔融金属由惰性气体加压; 用于打开和关闭用于连通的孔的开关阀(5); 感测装置(15),用于感测加压室中的熔融金属上的空间与茎或引导管连通; 以及用于向加压室的上部供给惰性气体的装置(30)。
    • 7. 发明授权
    • Vacuum casting method
    • 真空铸造法
    • US5462107A
    • 1995-10-31
    • US266549
    • 1994-06-28
    • Tamotsu HasegawaYasuyuki ArakawaAtushi Ota
    • Tamotsu HasegawaYasuyuki ArakawaAtushi Ota
    • B22D18/08B22D18/06B22D18/04
    • B22D18/06
    • In a vacuum casting method, a molding cavity is reduced in pressure to a vacuum, and when a gate is opened, a molten metal which has been raised to a molten metal retaining dome is charged into the molding cavity at a high speed. When a portion of a molten metal held in a molten metal holding furnace is raised to the molten metal retaining dome via a stalk, (1) the rising speed of a portion of the molten metal is set at 5-10 cm/sec, or (2) the rising speed is varied between an early stage of the rising motion and a later stage of the rising motion. In the latter method, the rising speed at the early stage of the rising motion is set at a speed higher than 10 cm/sec, while the rising speed at the later stage of the rising motion is set at 5-10 cm/sec. Due to the rising speed control, air involvement by the rising molten metal is effectively prevented.
    • 在真空铸造方法中,模制空腔的压力降低到真空,当打开浇口时,已经升高到熔融金属保持圆顶的熔融金属以高速加入到模腔中。 当保持在熔融金属保持炉中的熔融金属的一部分经由柄杆升高到熔融金属保持拱顶时,(1)将熔融金属的一部分的上升速度设定为5-10cm / sec,或 (2)上升速度在上升运动的早期阶段与上升运动的后期阶段不同。 在后一种方法中,将上升运动的早期阶段的上升速度设定为高于10cm / sec的速度,而将上升运动的后期的上升速度设定为5-10cm / sec。 由于速度控制的上升,有效地防止了上升的熔融金属对空气的影响。