    • METHOD FOR OPERATING A PRESSURIZED WATER REACTOR DURING LOAD MONITORING
    • 负荷监测期间加压水反应器的运行方法
    • US20160329116A1
    • 2016-11-10
    • US14005065
    • 2012-03-15
    • Alain GROSSETETE
    • Alain GROSSETETE
    • G21D3/00G21D3/16G21D3/10G21C7/08G21C7/22
    • G21D3/001G21C7/08G21C7/22G21D3/10G21D3/16Y02E30/32Y02E30/39
    • The present invention relates to a method for controlling a pressurized water reactor (100) comprising the steps that involve measuring the effective power (Pe) of the nuclear reactor; acquiring a reference value for the desired power (Pc); acquiring an estimated duration (DURATION) for the increase in power in order to achieve said reference value of the target power (Pc) desired, said estimated duration (DURATION) corresponding to the time taken for the power to increase from said effective power (Pe) to said reference value for the target power (Pc); determining the reference position (Z) of at least one control rod cluster among said plurality of control rod clusters (40) in order to achieve said reference value for said target power (Pc) desired as a function of said estimated duration (DURATION), of said measured effective power (Pe) and of said reference value for said target power (Pc); monitoring the position of said at least one control rod cluster so as to position it in its reference position (Z).
    • 本发明涉及一种用于控制压水反应堆(100)的方法,包括测量核反应堆的有效功率(Pe)的步骤; 获取所需功率(Pc)的参考值; 获取用于增加功率的估计持续时间(DURATION),以实现所需目标功率(Pc)的所述参考值,所述估计持续时间(DURATION)对应于从所述有效功率增加功率所花费的时间(Pe )到目标功率(Pc)的所述参考值; 确定所述多个控制棒簇(40)中的至少一个控制棒簇的参考位置(Z),以便根据所述估计持续时间(DURATION)达到所需要的所述目标功率(Pc)的所述参考值, 的所述测量有效功率(Pe)和所述目标功率(Pc)的所述参考值; 监视所述至少一个控制棒组的位置,以将其定位在其参考位置(Z)中。
    • 8. 发明申请
    • COMPACT NUCLEAR REACTOR
    • 紧凑型核反应堆
    • US20150243377A1
    • 2015-08-27
    • US14665341
    • 2015-03-23
    • Babcock & Wilcox Nuclear Energy, Inc.
    • John D. MalloyMathew W. Ales
    • G21C1/32G21C1/08G21C7/08
    • G21C1/322G21C1/086G21C7/08G21C15/243Y02E30/32Y02E30/39
    • A pressurized water nuclear reactor (PWR) includes a once through steam generator (OTSG) disposed in a generally cylindrical pressure vessel and a divider plate spaced apart from the open end of a central riser. A sealing portion of the pressure vessel and the divider plate define an integral pressurizer volume that is separated by the divider plate from the remaining interior volume of the pressure vessel. An internal control rod drive mechanism (CRDM) has all mechanical and electromagnetomotive components including at least a motor and a lead screw disposed inside the pressure vessel. Optionally CRDM units are staggered at two or more different levels such that no two neighboring CRDM units are at the same level. Internal primary coolant pumps have all mechanical and electromagnetomotive components including at least a motor and at least one impeller disposed inside the pressure vessel. Optionally, the pumps and/or CRDM are arranged below the OTSG
    • 加压水核反应堆(PWR)包括设置在大致圆柱形的压力容器中的一次性蒸汽发生器(OTSG)和与中央提升管的开口端间隔开的分隔板。 压力容器和分隔板的密封部分限定了由分隔板与压力容器的剩余内部容积隔开的整体加压器体积。 内部控制杆驱动机构(CRDM)具有至少包括设置在压力容器内部的电动机和导螺杆的所有机械和电动汽车部件。 可选地,CRDM单元在两个或更多个不同级别交错,使得没有两个相邻的CRDM单元处于相同的水平。 内部主冷却剂泵具有所有机械和电动汽车部件,其包括至少一个电动机和至少一个设置在压力容器内的叶轮。 可选地,泵和/或CRDM布置在OTSG的下方