会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Deicing louvers for datacenter applications
    • 数据中心应用程序的除冰百叶窗
    • US08978747B2
    • 2015-03-17
    • US12982884
    • 2010-12-31
    • Eric C PetersonChristian L. Belady
    • Eric C PetersonChristian L. Belady
    • H05K7/00F24F12/00F24F13/00H05K7/20F24F13/14F24F11/00
    • H05K7/20745F24F11/41F24F13/14H05K7/20836Y10S165/909
    • A datacenter may use heat collected from a heat exchanger at the exhaust portion of a cooling system to heat inlet louvers for an atmospheric intake. The louvers may have fluid passages through which heated fluid may pass and cause the louvers to heat up. The heated louvers may operate during periods of snow, rain, high humidity, or other conditions to eliminate condensation, snow and ice buildup, or other problems. In some embodiments, a liquid may be passed through the louvers, while in other embodiments, heated air or other gas may be passed through conductive paths in the louvers. In a heated air system, holes in the louvers may allow the heated air to enter the incoming airstream to regulate the incoming temperature to the datacenter.
    • 数据中心可以使用从冷却系统的排气部分的热交换器收集的热量来加热大气摄入的入口百叶窗。 百叶窗可以具有流体通道,加热的流体可以通过流体通道,并使百叶窗加热。 加热的百叶窗可以在雪,雨,高湿度或其他条件期间操作,以消除冷凝,积雪积雪或其他问题。 在一些实施例中,液体可以通过百叶窗,而在其他实施例中,加热的空气或其它气体可以通过百叶窗中的导电路径。 在加热的空气系统中,百叶窗中的孔可以允许加热的空气进入进入的空气流以调节到数据中心的进入温度。
    • 9. 发明授权
    • System and method for controlling power to resources based on historical utilization data
    • 基于历史使用数据控制资源的系统和方法
    • US08041967B2
    • 2011-10-18
    • US11058554
    • 2005-02-15
    • Christian L. BeladyTom L. Vaden
    • Christian L. BeladyTom L. Vaden
    • G06F1/26G06F1/32
    • G06F1/3203G06F1/325G06F1/3275G06F1/3287Y02D10/14Y02D10/171
    • A method comprises collecting utilization data for a resource, and predicting by a power management system, based on the collected utilization data, future utilization of the resource. The method further comprises controlling, by the power management system, power to the resource, based at least in part on the predicted future utilization of the resource. In one embodiment, the utilization data is collected for a plurality of resources that are operable to perform tasks, and the method further comprises determining, by the power management system, how many of the resources are needed to provide a desired capacity for servicing the predicted future utilization of the resources for performing the tasks. The method further comprises configuring, by the power management system, ones of the resources exceeding the determined number of resources needed to provide the desired capacity in a reduced power-consumption mode.
    • 一种方法包括收集资源的利用数据,以及由电力管理系统基于收集的利用数据预测资源的未来利用。 该方法还包括至少部分地基于资源的预测的未来利用来控制电力管理系统对资源的功率。 在一个实施例中,针对可操作以执行任务的多个资源收集利用数据,并且该方法还包括由电力管理系统确定需要多少资源以提供用于维护预测的所需能力 未来利用资源执行任务。 该方法还包括通过电力管理系统配置超过确定的资源数量中的一个资源,以在降低的功耗模式中提供期望的容量所需的资源。