热词
    • 6. 发明申请
    • DISTRIBUTED ELECTRICAL POWER NETWORK MODEL MAINTENANCE
    • 分布式电力网络模型维护
    • WO2013158813A1
    • 2013-10-24
    • PCT/US2013/037055
    • 2013-04-18
    • ABB RESEARCH LTD.STOUPIS, JamesWANG, Zhenyuan
    • STOUPIS, JamesWANG, Zhenyuan
    • H02J3/00
    • H02J3/00H02J2003/007Y02E60/76Y04S40/22
    • Among other things, one or more techniques and/or systems are provided for maintaining a distributed electrical power network model associated with a power grid. A global power network model, comprising a global logical representation of the power grid, may be maintained at a network control center configured to manage one or more substations associated with the power grid. The network control center may host grid management applications that may utilize the global power network model. A local power network model, comprising a local logical representation of a power grid territory within the power grid monitored by a substation, may be maintained at the substation. The substation may host one or more local grid management applications that may utilize the local power network model. The global power network model and the local power network model may be synchronized in response to events occurring within the power grid.
    • 除其他之外,提供一个或多个技术和/或系统用于维护与电网相关联的分布式电力网络模型。 可以在被配置为管理与电网相关联的一个或多个变电站的网络控制中心处保持包括电网的全局逻辑表示的全球电力网络模型。 网络控制中心可以托管可以利用全球电力网络模型的电网管理应用。 在变电站可以维护包括由变电站监控的电力网内的电网区域的本地逻辑表示的局部电力网络模型。 变电站可以承载可以利用本地电力网络模型的一个或多个本地电网管理应用。 全球电力网络模型和本地电力网络模型可以响应于电网内发生的事件而同步。
    • 8. 发明申请
    • FEEDER AUTOMATION FOR AN ELECTRIC POWER DISTRIBUTION SYSTEM
    • 馈电自动化用于电力分配系统
    • WO2010080490A1
    • 2010-07-15
    • PCT/US2009/068443
    • 2009-12-17
    • ABB RESEARCH LTD.YANG, FangSTOUPIS, JamesDONDE, Vaibhav
    • YANG, FangSTOUPIS, JamesDONDE, Vaibhav
    • H02J3/00H02J13/00H02H7/26
    • H02J13/00H02H7/261H02J3/006Y04S10/525
    • A soft PLC technology based computer-implemented method includes updating a system configuration incidence matrix for an electric power distribution system based on both a depth-first search of a connectivity matrix for the electric power distribution system and information about the electric power distribution system, wherein the information includes at least status information about one or more switches of the electric power distribution system. The method further includes detecting a fault in the system based on the incidence matrix. The method further includes generating isolation control logic based on the incidence matrix and isolating the fault based on isolation control logic. The method further includes generating restoration control logic based on a breadth-first search of the incidence matrix and restoring the system based on the restoration control logic.
    • 基于软PLC技术的计算机实现方法包括基于用于配电系统的连接矩阵的深度优先搜索和关于配电系统的信息来更新用于配电系统的系统配置入射矩阵,其中 该信息至少包括关于电力分配系统的一个或多个开关的状态信息。 该方法还包括基于入射矩阵来检测系统中的故障。 该方法还包括基于入射矩阵产生隔离控制逻辑,并基于隔离控制逻辑隔离故障。 该方法还包括基于入射矩阵的宽度优先搜索生成恢复控制逻辑,并且基于恢复控制逻辑恢复系统。