会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明专利
    • Waterproof mat for riverbed, and method for laying the same
    • 用于河床的防水垫及其相同的方法
    • JP2013249674A
    • 2013-12-12
    • JP2012126302
    • 2012-06-01
    • C I Kasei Co Ltdシーアイ化成株式会社
    • MIYANO MASATOWATABE NAOTOHIUGA YUKI
    • E02B3/12
    • PROBLEM TO BE SOLVED: To provide a waterproof mat for a riverbed, which enables an anchor pin to be driven in any position by preventing an anchor pin driving position from being restricted, and a method for laying the same.SOLUTION: A waterproof mat 11 for a riverbed includes: a water sealing sheet 15 which has an undersurface side formed as an uneven surface 13; a water-absorbing nonwoven fabric 19 which is formed smaller by an overlap margin 17 than the water sealing sheet 15 and superposed on the top surface of the water sealing sheet 15; and a nonwoven fabric 21 with cushioning properties, which is formed in such a manner as to be identical in outer shape to the water-absorbing nonwoven fabric 19 and superposed on the top surface of the water-absorbing nonwoven fabric 19.
    • 要解决的问题:提供一种用于河床的防水垫,其能够通过防止锚销驱动位置受到限制而使锚销在任何位置被驱动,以及用于铺设其的方法。解决方案:防水垫11 河床包括:具有形成为不平坦表面13的下表面侧的水封片15; 吸水性无纺布19,其比与密封片15重叠的边缘17形成,并叠合在水封片15的上表面上; 和具有缓冲性能的无纺布21,其外形形状与吸水性无纺布19相同,叠置在吸水性无纺布19的上表面上。
    • 3. 发明专利
    • Laying method of water cut-off mat for river
    • 水切割板的铺设方法
    • JP2013108332A
    • 2013-06-06
    • JP2011256392
    • 2011-11-24
    • C I Kasei Co Ltdシーアイ化成株式会社
    • MIYANO MASATOWATABE NAOTOHIUGA YUKI
    • E02B3/12
    • PROBLEM TO BE SOLVED: To provide a laying method of a water cut-off mat for a river, which achieves the easiness of construction and workability with light-weight and prevents water leakage from a hole due to installation of an anchor pin.SOLUTION: A water cut-off mat 11 for a river is laid on a river levee and revetment. A water cut-off sheet 13 formed of a waterproof synthetic resin having one concavo-convex surface 19 opposite to the ground surface 27 of a revetment, and a protective mat 15 formed of a nonwoven cloth having cushioning properties spread on another face 21 side of the water cut-off sheet 13 are integrated into the water cut-off mat 11 for a river. A laying method of the water cut-off mat 11 for a river includes fixing the mat 11 to the ground surface 27 by installing an anchor pin 25 formed of deformed steel bar at a desired place. A sealing material 17 is injected in the desired place of the protective mat 15 at the installation place of the anchor pin 25 so that the anchor pin 25 is installed at the place injected with the sealing material 17.
    • 要解决的问题:提供一种用于河流的截水垫的铺设方法,其实现了轻便的施工和可加工性的容易性,并且防止由于安装锚栓导致的孔漏水 。

      解决方案:一条河的隔水垫11铺设在河堤和护岸上。 由防水合成树脂形成的防水片13,其具有与护岸的地面27相对的一个凹凸表面19,以及由具有缓冲性的非织造布形成的保护垫15, 防水片13一体化成用于河流的截水垫11。 用于河流的防水垫11的铺设方法包括通过在期望的地方安装由变形的钢筋形成的锚定销25将垫11固定到地面27。 密封材料17在锚定销25的安装位置被注入到保护垫15的所需位置,使得锚固销25安装在注入密封材料17的位置。(C) 2013年,JPO&INPIT