    • 42. 发明申请
    • METHOD FOR SIMULTANEOUSLY CONSIDERING CUSTOMER COMMIT DATES AND CUSTOMER REQUEST DATES
    • 同时考虑客户承诺日期和客户申请日期的方法
    • US20100280868A1
    • 2010-11-04
    • US12765054
    • 2010-04-22
    • Brian T. DentonRobert J. Milne
    • Brian T. DentonRobert J. Milne
    • G06Q10/00G06Q50/00
    • G06Q10/06G06Q10/06312G06Q10/06314G06Q10/06315G06Q10/067G06Q10/103G06Q30/0202Y02P90/20
    • The invention disclosed here is a method for achieving simultaneous consideration of multiple customer demand dates within an advanced planning system. The invention provides a method of production planning that considers multiple due dates. The invention solves a production planning model based upon the second (commit) date to produce a first solution, sorts the demand records in order of importance, and then re-solves the production planning model based upon the first (request) date to produce a second solution. The re-solving process is performed on each demand item in the sorted order of importance. The invention optimizes between the first solution and the second solution. Before re-solving the production planning model, the invention changes the lower bound constraints on backorder variables. The re-solving process changes the required date for a single demand item, and this re-solving process is repeated for all demand items that have a first (request) date that is before a corresponding required date. The invention reports the optimal solution produced during the optimizing process. The system and method integrate the consideration of multiple demand dates with an advanced planning system for optimizing established planning objectives (e.g. customer service, short lead times, low inventory, and prioritized allocation of supply and capacity) to compute a feasible production plan for the division.
    • 这里公开的发明是在高级规划系统内同时考虑多个客户需求日期的方法。 本发明提供了考虑多个到期日的生产计划的方法。 本发明基于第二(提交)日期来解决生产计划模型以产生第一解决方案,按照重要性的顺序对需求记录进行排序,然后基于第一(请求)日期重新解决生产计划模型,以产生 第二个解决方案。 重新解决过程按照重要性的排序顺序对每个需求项进行。 本发明优化了第一溶液和第二溶液。 在重新解决生产计划模型之前,本发明改变了对逆序变量的下限约束。 重新解决过程更改单个需求项目的所需日期,并且对于在相应的所需日期之前的第一个(请求)日期的所有需求项目重复该重新解决过程。 本发明报告了在优化过程中产生的最佳解决方案。 系统和方法将多个需求日期的考虑与先进的计划制度结合起来,以优化既定的规划目标(例如客户服务,交货期短,库存低,供应和能力优先配置),以计算可行的生产计划 。
    • 43. 发明申请
    • Method for Simultaneously Considering Customer Support Dates and Customer Request Dates
    • 同时考虑客户支持日期和客户请求日期的方法
    • US20090210279A1
    • 2009-08-20
    • US12434733
    • 2009-05-04
    • Brian T. DentonRobert J. Milne
    • Brian T. DentonRobert J. Milne
    • G06Q10/00
    • G06Q10/06G06Q10/06312G06Q10/06314G06Q10/06315G06Q10/067G06Q10/103G06Q30/0202Y02P90/20
    • The invention disclosed here is a method for achieving simultaneous consideration of multiple customer demand dates within an advanced planning system. The invention provides a method of production planning that considers multiple due dates. The invention solves a production planning model based upon the second (commit) date to produce a first solution, sorts the demand records in order of importance, and then re-solves the production planning model based upon the first (request) date to produce a second solution. The re-solving process is performed on each demand item in the sorted order of importance. The invention optimizes between the first solution and the second solution. Before re-solving the production planning model, the invention changes the lower bound constraints on backorder variables. The re-solving process changes the required date for a single demand item, and this re-solving process is repeated for all demand items that have a first (request) date that is before a corresponding required date. The invention reports the optimal solution produced during the optimizing process. The system and method integrate the consideration of multiple demand dates with an advanced planning system for optimizing established planning objectives (e.g. customer service, short lead times, low inventory, and prioritized allocation of supply and capacity) to compute a feasible production plan for the division.
    • 这里公开的发明是在高级规划系统内同时考虑多个客户需求日期的方法。 本发明提供了考虑多个到期日的生产计划的方法。 本发明基于第二(提交)日期来解决生产计划模型以产生第一解决方案,按照重要性的顺序对需求记录进行排序,然后基于第一(请求)日期重新解决生产计划模型,以产生 第二个解决方案。 重新解决过程按照重要性的排序顺序对每个需求项进行。 本发明优化了第一溶液和第二溶液。 在重新解决生产计划模型之前,本发明改变了对逆序变量的下限约束。 重新解决过程更改单个需求项目的所需日期,并且对于在相应的所需日期之前的第一个(请求)日期的所有需求项目重复该重新解决过程。 本发明报告了在优化过程中产生的最佳解决方案。 系统和方法将多个需求日期的考虑与先进的计划制度结合起来,以优化既定的规划目标(例如客户服务,交货期短,库存低,供应和能力优先配置),以计算可行的生产计划 。