会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 8. 发明申请
    • Soil and Rock Grouting Using a Hydrajetting Tool
    • 使用Hydrajetting工具进行土壤和岩石灌浆
    • US20170002535A1
    • 2017-01-05
    • US15113235
    • 2014-04-07
    • HALLIBURTON ENERGY SERVICES, INC.
    • Jim Basuki Surjaatmadja
    • E02D3/12E02D31/08E02D37/00E02D19/16
    • E02D3/12E02D19/16E02D31/08E02D37/00E02D2300/0037
    • Methods including providing a hydrajetting tool comprising a housing having a top end and a bottom end and having a plurality of jetting nozzles disposed thereon, the top end of the housing fluidly coupled to a tool string; providing at least one sub-soil-surface cavity adjacent to or in unstable soil, the unstable soil having a plurality of channels therein; introducing the hydrajetting tool into the at least one sub-soil-surface cavity; injecting a cement slurry through at least one of the jetting nozzles and into the sub-soil-surface cavity; permeating the cement slurry into the plurality of channels in the unstable soil; filling the at least one sub-soil-surface cavity with the cement slurry; and curing the cement slurry, thereby forming a stable soil and a cement pillar in the at least one sub-soil-surface cavity.
    • 方法包括提供一种水喷射工具,其包括具有顶端和底端的壳体,并且具有设置在其上的多个喷射喷嘴,壳体的顶端流体地联接到工具串; 提供与不稳定土壤相邻或不稳定的土壤中的至少一个亚土壤表面腔,所述不稳定土壤中具有多个通道; 将所述水力喷射工具引入所述至少一个亚土表面腔; 通过至少一个所述喷射喷嘴注入水泥浆料并进入所述次土壤表面腔; 将水泥泥浆渗入不稳定土壤中的多个通道; 用所述水泥浆填充所述至少一个亚土表面腔; 并固化所述水泥浆料,从而在所述至少一个亚土表面空腔中形成稳定的土壤和水泥柱。
    • 9. 发明授权
    • Systems and methods for removing a section of casing
    • 用于去除套管部分的系统和方法
    • US09359848B2
    • 2016-06-07
    • US13909190
    • 2013-06-04
    • Halliburton Energy Services, Inc.
    • Jim Basuki SurjaatmadjaJorn Tore GiskemoOyvind RakstangAimee GreeningDesmond Jones
    • E21B29/06E21B29/00
    • E21B29/002E21B29/06
    • A method includes conveying a casing cutting tool into the wellbore lined with at least one casing string and cement, and stroking the casing cutting tool over a predetermined axial length of the wellbore while ejecting fluid from one or more nozzles in the casing cutting tool and thereby forming a plurality of longitudinal cuts through the casing string and cement. The casing cutting tool is then rotated about its longitudinal axis at two or more axially offset locations along the predetermined axial length while ejecting fluid from nozzles and thereby forming a plurality of axially offset transverse cuts in the casing string and the cement. The longitudinal cuts and axially offset transverse cuts form wedges in the wellbore, and the wedges are dislodged from the wellbore to expose formation rock along the predetermined axial length.
    • 一种方法包括将套管切割工具输送到衬管中的至少一个套管柱和水泥的井筒中,并且在套管切割工具中的一个或多个喷嘴喷射流体的同时将套管切割工具移动超过井筒的预定轴向长度,从而 形成穿过套管柱和水泥的多个纵向切口。 然后,套管切割工具围绕其纵向轴线沿着预定轴向长度在两个或更多个轴向偏移位置处旋转,同时从喷嘴喷射流体,从而在套管柱和水泥中形成多个轴向偏移的横向切口。 纵向切口和轴向偏移的横向切口在井眼中形成楔形,并且楔形件从井筒移除以沿着预定的轴向长度暴露地层岩石。