会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • TUNNEL FAULT DETECTION METHOD AND TRAFFIC ENGINEERING NODE
    • 隧道故障检测方法和交通工程节点
    • US20130279324A1
    • 2013-10-24
    • US13925097
    • 2013-06-24
    • Huawei Technologies Co., Ltd.
    • Fei ChenTao BaiLei Chen
    • H04L12/24
    • H04L41/0654H04L12/4633H04L43/0811H04L45/28
    • The embodiments of the present invention provide a tunnel fault detection method and a traffic engineering (TE) node. The method includes: receiving, by a traffic engineering TE node, a link fault report packet; determining, by the node, a faulty link in which a fault occurs according to the link fault report packet; detecting, by the node, whether one or more tunnels which use the node as an ingress node and pass through the faulty link exist; and identifying the tunnels as faulty tunnels if the one or more tunnels which use the node as the ingress node and pass through the faulty link exist. In the embodiments of the present invention, the TE node can detect all faulty tunnels at a time, and it is not necessary to wait until the fault notification based on each tunnel is received and then the faulty tunnel is identified one by one.
    • 本发明的实施例提供一种隧道故障检测方法和流量工程(TE)节点。 该方法包括:由流量工程TE节点接收链路故障报告分组; 由所述节点根据所述链路故障报告分组确定故障发生的故障链路; 由节点检测是否存在使用节点作为入节点并通过故障链路的一个或多个隧道; 并且如果存在使用节点作为入口节点并通过故障链路的一个或多个隧道,则将隧道识别为故障隧道。 在本发明的实施例中,TE节点可以一次检测到所有故障的隧道,并且不需要等待直到基于每个隧道的故障通知被接收到,然后逐个识别故障隧道。
    • 6. 发明申请
    • Control Channel Establishing Method, Forwarding Point, and Controller
    • 控制通道建立方法,转发点和控制器
    • US20150304218A1
    • 2015-10-22
    • US14792294
    • 2015-07-06
    • Huawei Technologies Co., Ltd.
    • Jun WangTao Bai
    • H04L12/741H04L12/24
    • H04L45/74H04L12/4641H04L12/66H04L41/0813H04L41/12H04L45/02H04L45/22H04L45/28H04L45/42H04L45/64Y02D30/30
    • The present invention provides a control channel establishing method, a forwarding point, and a controller. The method includes: sending, by a first FP, topology information of the first FP to a second FP by using the LLDP; receiving, by the first FP, first routing information that is sent by the controller and is used by the first FP to reach the controller, where the first routing information is generated by the controller according to the topology information of the first FP; and establishing, by the first FP, a second control channel with the controller according to the first routing information. The first FP does not need to run the IGP protocol, thereby avoiding that the first FP maintains an IGP neighbor relationship; moreover, the first FP does not need to store routing information for reaching another FP, which helps save storage resources and helps improve forwarding performance.
    • 本发明提供一种控制信道建立方法,转发点和控制器。 该方法包括:通过使用LLDP将第一FP的拓扑信息发送到第二FP; 通过第一FP接收由控制器发送并由第一FP使用的第一路由信息到达控制器,其中控制器根据第一FP的拓扑信息生成第一路由信息; 以及通过所述第一FP建立与所述控制器根据所述第一路由信息的第二控制信道。 第一个FP不需要运行IGP协议,从而避免了第一个FP维护IGP邻居关系; 此外,第一个FP不需要存储用于到达另一个FP的路由信息​​,这有助于节省存储资源并有助于提高转发性能。