    • Project assessment system and method
    • 项目评估制度和方法
    • US07729932B2
    • 2010-06-01
    • US10685839
    • 2003-10-14
    • Takeshi YokotaHisanori NonakaKenji ArakiYouichi NishikawaMakoto Kudoh
    • Takeshi YokotaHisanori NonakaKenji ArakiYouichi NishikawaMakoto Kudoh
    • G06F17/30
    • G06Q10/06G06Q10/063118G06Q10/06375
    • A computer readable storage medium encoded with a project assessment program for assessing a project including a plurality of processes when executed by a computer computing forecasts of the project based on a set of information. At least one scheme by a user input is selected from a group of schemes including an estimation of mutual-correlation of estimated value pattern. Process planning information, up-to-date actual process information and forecast model information of each process included in the project is retrieved. The forecast model information of each process of the project is defined as probability distribution variations of a plurality of parameters of the processes, wherein the probability distribution variations are quantitative values of the project. Estimated values of variations in at least two parameters of the processes using the process planning information, the up-to-date actual process information and the forecast model information are computed.
    • 一种用项目评估程序编码的计算机可读存储介质,所述项目评估程序用于当基于一组信息由计算机计算项目的预测来执行时评估包括多个处理的项目。 从包括估计值图案的相互关系的估计的方案组中选择用户输入的至少一个方案。 检索过程计划信息,包含在项目中的每个过程的最新实际过程信息和预测模型信息。 项目每个过程的预测模型信息被定义为过程的多个参数的概率分布变化,其中概率分布变化是项目的定量值。 计算使用过程规划信息的过程的至少两个参数的变化的估计值,最新的实际过程信息和预测模型信息。
    • 8. 发明授权
    • Operation simulation system for plant construction
    • 工厂建设运行模拟系统
    • US08095346B2
    • 2012-01-10
    • US12353373
    • 2009-01-14
    • Yoshibumi FukudaKenji ArakiHisanori NonakaNorito WatanabeToshiyuki MiyakeKensuke MoritaKenji Akagi
    • Yoshibumi FukudaKenji ArakiHisanori NonakaNorito WatanabeToshiyuki MiyakeKensuke MoritaKenji Akagi
    • G06G7/48
    • G06Q10/06G06Q50/08
    • An operation simulation system for plant construction, having operating expense calculated based on crane type determined by a command input; the expense to construct foundation calculated based on the foundation placement on which the determined crane is put; the operating expense calculated based on a period during which an operation is carried out; the expense to temporarily place the installation object calculated based on the specifications of the installation object before the installation; the installation operation expense calculated based on an installation milestone reflecting a due date of the installation object; the total necessary expense calculated based on all the expenses calculated; the total necessary expense is analyzed and evaluated; and the command input is adjusted by reflecting the results of an evaluation analysis so that the value of the command input falls in range of the set values in the specifications held by the corresponding setting apparatus.
    • 一种用于工厂建造的操作模拟系统,具有基于由命令输入确定的起重机类型计算的操作费用; 根据确定的起重机的基础位置计算建造基础的费用; 基于进行操作的期间计算的营业费用; 在安装前根据安装对象的规格临时放置安装对象的费用; 安装操作费用根据反映安装对象到期日的安装里程计算; 根据所计算的所有费用计算所需总费用; 对总需求费用进行分析评估; 并且通过反映评估分析的结果来调整命令输入,使得命令输入的值落在由相应的设置装置保持的规格中的设定值的范围内。