    • 4. 发明授权
    • Operation simulation system for plant construction
    • 工厂建设运行模拟系统
    • US08095346B2
    • 2012-01-10
    • US12353373
    • 2009-01-14
    • Yoshibumi FukudaKenji ArakiHisanori NonakaNorito WatanabeToshiyuki MiyakeKensuke MoritaKenji Akagi
    • Yoshibumi FukudaKenji ArakiHisanori NonakaNorito WatanabeToshiyuki MiyakeKensuke MoritaKenji Akagi
    • G06G7/48
    • G06Q10/06G06Q50/08
    • An operation simulation system for plant construction, having operating expense calculated based on crane type determined by a command input; the expense to construct foundation calculated based on the foundation placement on which the determined crane is put; the operating expense calculated based on a period during which an operation is carried out; the expense to temporarily place the installation object calculated based on the specifications of the installation object before the installation; the installation operation expense calculated based on an installation milestone reflecting a due date of the installation object; the total necessary expense calculated based on all the expenses calculated; the total necessary expense is analyzed and evaluated; and the command input is adjusted by reflecting the results of an evaluation analysis so that the value of the command input falls in range of the set values in the specifications held by the corresponding setting apparatus.
    • 一种用于工厂建造的操作模拟系统,具有基于由命令输入确定的起重机类型计算的操作费用; 根据确定的起重机的基础位置计算建造基础的费用; 基于进行操作的期间计算的营业费用; 在安装前根据安装对象的规格临时放置安装对象的费用; 安装操作费用根据反映安装对象到期日的安装里程计算; 根据所计算的所有费用计算所需总费用; 对总需求费用进行分析评估; 并且通过反映评估分析的结果来调整命令输入,使得命令输入的值落在由相应的设置装置保持的规格中的设定值的范围内。
    • 9. 发明授权
    • System and method for visualizing the construction progress of scaffolding utilizing 3D CAD models
    • 使用3D CAD模型可视化脚手架施工进度的系统和方法
    • US08249909B2
    • 2012-08-21
    • US12607543
    • 2009-10-28
    • Norito WatanabeKenji ArakiToshiyuki Miyake
    • Norito WatanabeKenji ArakiToshiyuki Miyake
    • G06Q10/00
    • G06Q50/08G06F17/5004G06Q10/06G06Q10/0631
    • A construction progress visualization system, having a scaffolding model creating-unit for creating an area and a form of scaffolding required for a construction operation based on a 3D CAD model and a construction schedule data; a scaffolding schedule extracting-unit for extracting scaffolding schedule data regarding the scaffolding from the construction schedule data; a scaffolding display form determining-unit for determining a completion rate of the scaffolding on a visualization-target date based on a relationship between the visualization-target date and the scaffolding schedule data, and obtaining a display form of the scaffolding; and a display process unit for displaying, concurrently with the CAD model, the scaffolding area based on the obtained display form of the scaffolding.
    • 一种施工进度可视化系统,具有用于创建基于3D CAD模型和施工进度数据的施工操作所需的区域和脚手架形式的脚手架模型创建单元; 一种用于从施工进度数据提取关于脚手架的脚手架计划数据的脚手架计划提取单元; 脚手架显示形式确定单元,用于基于所述可视化目标日期和所述脚手架计划数据之间的关系,确定所述脚手架在可视化目标日期的完成率,以及获取所述脚手架的显示形式; 以及显示处理单元,用于基于获得的脚手架的显示形式与CAD模型同时显示脚手架区域。