会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明申请
    • EVENT-BASED CONTROL SYSTEM FOR WIND TURBINE GENERATORS
    • 用于风力发电机的基于事件的控制系统
    • US20110004356A1
    • 2011-01-06
    • US12808755
    • 2008-12-19
    • Jorge Martinez Garcia
    • Jorge Martinez Garcia
    • G06F19/00
    • F03D7/048F03D7/0284F03D7/044F03D7/046H02J3/386Y02E10/723Y02E10/763
    • The present invention relates to a control system comprising a control interface between one or more wind turbine generators and a power grid, where the wind turbine generators are coupled to the power grid and contribute to the power production of the grid. The control interface is arranged to receive a set of event data. In embodiments, the set of event data may be any data available to a SCADA system. The set of event data is analysed in terms of predetermined event rules comprising at least one predefined event condition and a set of adaptive event conditions. Based on the analysis an event output is provided in order to control a parameter of the one or more wind turbine generators. In embodiments, the control system may be implemented in, or in connection with a SCADA system, moreover, the event output may be based on fuzzy logic, a neural network or statistical analysis.
    • 本发明涉及一种控制系统,其包括在一个或多个风力涡轮发电机和电力网之间的控制接口,其中所述风力涡轮发电机耦合到所述电网并有助于所述电网的发电。 控制接口被安排为接收一组事件数据。 在实施例中,事件数据集可以是SCADA系统可用的任何数据。 根据包括至少一个预定事件条件和一组自适应事件条件的预定事件规则来分析事件数据集。 基于分析,提供事件输出以便控制一个或多个风力涡轮发电机的参数。 在实施例中,控制系统可以在SCADA系统中或与SCADA系统相关联地实现,此外,事件输出可以基于模糊逻辑,神经网络或统计分析。
    • 8. 发明授权
    • Method of operating a turbine
    • 运行涡轮机的方法
    • US06840734B2
    • 2005-01-11
    • US10204854
    • 2001-03-08
    • Lars Henrik Hansen
    • Lars Henrik Hansen
    • F03D7/02F03D7/04F01B25/26
    • F03D7/0224F03D7/0256F03D7/0276F03D7/044F03D7/048F05B2270/20F05B2270/327F05B2270/335Y02E10/723
    • A method of controlling the speed of rotation of a turbine, the turbine comprising a rotor, the method comprising the steps of measuring or estimating power or torque related to the energy production of the turbine, processing the measured or estimated power or torque so as to obtain a corresponding rotational speed, comparing the obtained rotational speed to a first predefined threshold value and to a second predefined threshold value, the second predefined threshold value being larger than the first predefined threshold value, and controlling the speed of rotation of the rotor according to the obtained rotational speed, so as to obtain a predetermined energy production from the turbine, and in such a way that in case the obtained rotational speed does not exceed the first predefined threshold value, the predetermined energy production from the turbine is optimal, in case the obtained rotational speed exceeds the first predefined threshold value, but does not exceed the second predefined threshold value, the predetermined energy production from the turbine is optimal, in case the obtained rotational speed exceeds the second predefined threshold value, the speed of rotation of the rotor of the turbine is reduced in a predefined manner to a value corresponding to the first predefined threshold value.
    • 一种控制涡轮转速的方法,所述涡轮机包括转子,所述方法包括以下步骤:测量或估计与所述涡轮机的能量产生相关的功率或扭矩,处理所测量或估计的功率或扭矩,以便 获得相应的转速,将获得的转速与第一预定义阈值和第二预定义阈值进行比较,第二预定义阈值大于第一预定义阈值,并根据转速控制转子的转速 获得的转速,以便从涡轮机获得预定的能量产生,并且使得在获得的转速不超过第一预定阈值的情况下,来自涡轮机的预定能量产生是最佳的,在情况下 所获得的转速超过第一预定义阈值,但不超过第二预定义阈值 在获得的转速超过第二预定阈值的情况下,来自涡轮机的预定能量产生是最佳的,涡轮机的转子的旋转速度以预定的方式减小到对应于第一 预定阈值。