会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Service water heating unit
    • 服务水加热单元
    • US09574780B2
    • 2017-02-21
    • US13193808
    • 2011-07-29
    • Jens Kjær MilthersKim Hulegaard JensenLars Sund Mortensen
    • Jens Kjær MilthersKim Hulegaard JensenLars Sund Mortensen
    • F24D19/10
    • F24D19/1051F24D19/1006
    • The invention relates to a service water heating unit (2) comprising at least one heat exchanger (6), which comprises a first flow path (10) for a heating medium and a second flow path (12) for service water to be heated, a cold water line (DCW) and a circulation line (90) for heated service water opening into a junction (97) in an inlet line to the second flow path (12) of the heat exchanger (6), and comprising a control unit (101) for controlling the heating of service water, the control unit (101) being designed for detection of a service water request, wherein the control unit (101) is designed for evaluation of the output signal of a temperature sensor (96) which is arranged in the vicinity of the junction (97), but at a distance therefrom, in the cold water line (DCW).
    • 本发明涉及一种服务水加热单元(2),其包括至少一个热交换器(6),其包括用于加热介质的第一流动路径(10)和用于待加热的用水的第二流动路径(12) 一个冷水管线(DCW)和一个循环管线(90),用于在与热交换器(6)的第二流动路径(12)相连的入口管路中的连接处(97)中开启加热的服务水,并且包括控制单元 (101),用于控制服务水的加热,所述控制单元(101)被设计用于检测服务水请求,其中所述控制单元(101)被设计用于评估温度传感器(96)的输出信号, 配置在冷水管路(DCW)的连接处(97)的附近,但距离其一定距离。
    • 4. 发明授权
    • Controlling a climate control appliance in response to a reduced operation request
    • 响应减少的操作请求来控制气候控制设备
    • US09423144B2
    • 2016-08-23
    • US13471180
    • 2012-05-14
    • Edward B. EvansCarl J. MuellerJohn M. SartainJames P. Garozzo
    • Edward B. EvansCarl J. MuellerJohn M. SartainJames P. Garozzo
    • F24F11/00G05D23/19F24D19/10
    • F24F11/0012F24D19/1006F24F11/30F24F11/46F24F11/65F24F2011/0064F24F2011/0075F24F2110/10G05D23/1923
    • Controllers and methods for controlling operation of a climate control appliance for heating and/or cooling a space are provided. One example controller includes a memory for storing at least one temperature offset and a processor coupled to the memory. The processor is configured to receive the reduced operation request from at least one of a utility provider and a user of the controller, to receive a sensed temperature from at least one sensor disposed within the space, and to determine an artificial temperature based on the sensed temperature and the at least one temperature offset associated with the reduced operation request. The processor is configured to, in response to the reduced operation request, operate the climate control appliance based on a comparison of the set-point temperature and artificial temperature during a reduced operation interval, to thereby reduce operation of the climate control appliance in response to the reduced operation request.
    • 提供了用于控制用于加热和/或冷却空间的气候控制设备的操作的控制器和方法。 一个示例性控制器包括用于存储至少一个温度偏移的存储器和耦合到存储器的处理器。 所述处理器被配置为从所述控制器的公用事业提供者和用户的至少一个接收所述减少的操作请求,以从设置在所述空间内的至少一个传感器接收感测到的温度,并且基于所感测到的人造温度 温度和与减少的操作请求相关联的至少一个温度偏移。 处理器被配置为响应于减少的操作请求,在减少的操作间隔期间基于设定点温度和人造温度的比较来操作气候控制设备,从而减少气候控制设备的响应中的操作 减少操作请求。
    • 5. 发明申请
    • METHOD AND SYSTEM FOR DETECTING MALFUNCTION OF AN ELECTRIC BOILER
    • 用于检测电动锅炉故障的方法和系统
    • US20160169960A1
    • 2016-06-16
    • US14963250
    • 2015-12-09
    • Itay DAGAN
    • Itay DAGAN
    • G01R31/12G01N27/20
    • G01N27/20F24D19/0092F24D19/1006F24D2220/08F24H1/182G01R31/00
    • A method for detecting malfunction of an electric boiler, the method comprising: a) detecting over scale accumulation by the steps of: metering said boiler's heating cycle, being a time from activating said boiler by a thermostat thereof until deactivating said boiler by the thermostat; if said heating cycle is longer than said first threshold, then indicating over accumulation of scale in said boiler; b) detecting a malfunction of insulation of said boiler, by the steps of: metering said boiler's cooling cycle, being a time from deactivating said boiler by a thermostat thereof until reactivating said boiler by the thermostat; if said cooling cycle is shorter than said threshold, then indicating malfunction of insulation of said boiler; thereby allowing indicating malfunction of said boiler only by metering the heating and cooling cycles of said boiler.
    • 一种用于检测电锅炉故障的方法,所述方法包括:a)通过以下步骤检测超标积累:计量所述锅炉的加热循环,是通过其恒温器致动所述锅炉的时间,直到通过恒温器停用所述锅炉; 如果所述加热循环长于所述第一阈值,则指示在所述锅炉中积垢过量; b)通过以下步骤检测所述锅炉的绝缘故障:计量所述锅炉的冷却循环,是通过其恒温器使所述锅炉停用的时间,直到通过所述恒温器重新激活所述锅炉; 如果所述冷却循环短于所述阈值,则指示所述锅炉的绝缘故障; 从而仅通过计量所述锅炉的加热和冷却循环来指示所述锅炉的故障。