会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明授权
    • Energization evaluation test equipment of a PWM converter input filter
    • US11163012B2
    • 2021-11-02
    • US16273430
    • 2019-02-12
    • Toshiba Mitsubishi-Electric Industrial Systems Corporation
    • Ryo Iida
    • G01R1/30H02M1/12G01R31/40H02M1/00H02M7/217H03K7/08
    • An energization evaluation test equipment for an input filter of a large capacity PWM converter by reducing the power supply capacity to the equipment under test is provided. The energization evaluation test is equivalent to an actual load test. An equipment under test has an input filter connected to an output terminal of an AC power source and a PWM converter connected to an output terminal of the input filter to convert an AC power source to a DC power source. The evaluation test equipment includes a PWM converter input filter and a PWM converter configured similarly to the PWM converter input filter and the PWM converter of the equipment under test, respectively, a direct current reactor connected to an output terminal of a PWM converter of the equipment under test, a PWM controller for controlling the PWM converter of the equipment under test and controlling the PWM converter of the energization evaluation test equipment, wherein, outputs of the PWM converter of the equipment under test and the PWM converter of the energization evaluation test equipment are connected in series via the direct current reactor, and the PWM controller is performed so that the output voltage of the PWM converter of the equipment under test becomes a desired value and the output current of the PWM converter of the energization evaluation test equipment becomes a desired value.
    • 10. 发明申请
    • ENERGIZATION EVALUATION TEST EQUIPMENT OF A PWM CONVERTER INPUT FILTER
    • US20190173371A1
    • 2019-06-06
    • US16273430
    • 2019-02-12
    • Toshiba Mitsubishi-Electric Industrial Systems Corporation
    • Ryo IIDA
    • H02M1/12H02M7/217G01R31/02G01R1/30
    • An energization evaluation test equipment for an input filter of a large capacity PWM converter by reducing the power supply capacity to the equipment under test is provided. The energization. evaluation test is equivalent to an actual load test. An equipment under test has an input filter connected to an output terminal of an AC power source and a PWM converter connected to an output terminal of the input filter to convert an AC power source to a DC power source. The evaluation test equipment includes a PWM converter input filter and a PWM converter configured similarly to the PWM converter input filter and the PWM converter of the equipment under test, respectively, a direct current reactor connected to an output terminal of a PWM converter of the equipment under test, a PWM controller for controlling the PWM converter of the equipment under test and controlling the PWM converter of the energization evaluation test equipment, wherein, outputs of the PWM converter of the equipment under test and the PWM converter of the energization evaluation test equipment are connected in series via the direct current reactor, and the PWM controller is performed so that the output voltage of the PWM converter of the equipment under test becomes a desired value and the output current of the PWM converter of the energization evaluation test equipment becomes a desired value.