会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 23. 发明申请
    • DISTRIBUTED DATA COLLECTION FOR UTILITY GRIDS
    • 用于实用网格的分布式数据收集
    • US20120310559A1
    • 2012-12-06
    • US13483998
    • 2012-05-30
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • G06F19/00
    • H02J13/0013G05B23/0221Y02E60/74Y02E60/7807Y04S10/30Y04S40/12
    • In one embodiment, a system that provides distributed data collection for sensor networks in a utility grid comprises one or more data collection agents, one or more grid data collection service devices, and one or more points of use. The one or more data collection agents may be configured to generate grid data values that comprise raw grid data values, processed grid data values, and/or any combination thereof. The one or more data collection agents may be configured to communicate the grid data values using a communication network in the utility grid to the one or more grid data collection service devices, which may be configured to receive the grid data values in a time-synchronized manner, and to distribute the time-synchronized grid data values in substantially real-time to the one or more points of use.
    • 在一个实施例中,为公用电网中的传感器网络提供分布式数据收集的系统包括一个或多个数据收集代理,一个或多个网格数据收集服务设备以及一个或多个使用点。 一个或多个数据收集代理可以被配置为生成包括原始网格数据值,经处理的网格数据值和/或其任何组合的网格数据值。 一个或多个数据收集代理可以被配置为使用公用电网中的通信网络将网格数据值传送到一个或多个网格数据收集服务设备,其可被配置为以时间同步的方式接收网格数据值 方式,并将时间同步的网格数据值基本上实时地分发到一个或多个使用点。
    • 25. 发明授权
    • Determination of distribution transformer voltages based on metered loads
    • 基于计量负载确定配电变压器电压
    • US08103467B2
    • 2012-01-24
    • US12353836
    • 2009-01-14
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • G06F19/00H02M3/335
    • G01R19/2513
    • A method for determining a primary side voltage of a distribution transformer includes determining a first current and a second current flowing through a secondary winding of the transformer at a plurality of time instants based on current meter data generated by a plurality of metered loads. The method may include determining a total current flowing to the plurality of metered loads for each of the plurality of time instants based on the first current and the second current. The method includes receiving a respective meter voltage from each of the plurality of metered loads at each of the plurality of time instants. The method includes determining a secondary side voltage of the transformer at each of the plurality of time instants based on the first, second, and total current and the respective meter voltages. The method includes determining the primary side voltage based on the secondary side voltage.
    • 用于确定配电变压器的初级侧电压的方法包括基于由多个计量负载产生的电流表数据,在多个时刻确定流过变压器次级绕组的第一电流和第二电流。 该方法可以包括基于第一电流和第二电流确定流向多个计时负载的总电流,用于多个时刻中的每一个。 该方法包括在多个时刻的每个时刻从多个测量负载中的每一个接收相应的仪表电压。 该方法包括基于第一,第二和总电流以及相应的仪表电压来确定多个时刻中的每一个处的变压器的次级侧电压。 该方法包括基于次级侧电压来确定初级侧电压。
    • 26. 发明授权
    • Distribution system analysis using meter data
    • 配电系统分析采用仪表数据
    • US08103466B2
    • 2012-01-24
    • US12353413
    • 2009-01-14
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • G06F19/00
    • G01R21/1331G01R19/2513Y02E60/728Y04S10/265
    • A monitoring system includes a first sensor positioned at a first location along a phase conductor line and a second sensor position at a second location along the phase conductor line. The first sensor is configured to generate a first set of synchrophasor data. The second sensor is configured to generate a second set of synchrophasor data. The monitoring system includes a processor configured to receive the first and second sets of synchrophasor data. The processor is further configured to determine a primary side voltage of at least one distribution transformer electrically connected to the phase conductor line based on a secondary side voltage of the at least one distribution transformer. The processor is further configured to determine at least one phase conductor line condition based on the first and second sets of synchrophasor data and the primary side voltage.
    • 监测系统包括位于沿着相导线的第一位置处的第一传感器和沿着相导线的第二位置处的第二传感器位置。 第一传感器被配置为生成第一组同步信息数据。 第二传感器被配置为生成第二组同步信息数据。 监视系统包括被配置为接收第一组和第二组同步信息数据的处理器。 处理器还被配置为基于至少一个配电变压器的次级侧电压来确定电连接到相导线的至少一个配电变压器的初级侧电压。 处理器还被配置为基于第一组和第二组同步信号数据和初级侧电压来确定至少一个相导线条件。
    • 27. 发明申请
    • INTELLIGENT NETWORK
    • 智能网络
    • US20110004446A1
    • 2011-01-06
    • US12830053
    • 2010-07-02
    • John DornJeffrey D. Taft
    • John DornJeffrey D. Taft
    • G06F15/16G06F15/00
    • H04L67/12G01D4/002H04L43/0817Y02B90/241Y02B90/244Y04S20/32Y04S20/327Y04S40/168
    • A network intelligence system may include a plurality of sensors located throughout and industry system. The sensors may obtain data related to various aspects of the industry network. The network intelligence system may include system endpoint intelligence and system infrastructure intelligence. The system endpoint and system infrastructure intelligence may provide distributed intelligence allowing localized decision-making to be made within the industry system based in response to system operation and occurrences. The network intelligence may include a centralized intelligence portion to communicate with endpoint and infrastructure intelligence. The centralized intelligence portion may provide responses on a localized level of the system or on a system-wide level.
    • 网络智能系统可以包括位于整个行业系统中的多个传感器。 传感器可以获得与行业网络的各个方面相关的数据。 网络智能系统可以包括系统端点智能和系统基础设施智能。 系统端点和系统基础设施智能可以提供分布式智能,以响应于系统操作和事件,允许在行业系统内进行本地化决策。 网络智能可以包括与端点和基础架构智能通信的集中智能部分。 集中智能部分可以在系统的局部级别上或在系统级别上提供响应。
    • 28. 发明申请
    • DETERMINATION OF DISTRIBUTION TRANSFORMER VOLTAGES BASED ON METERED LOADS
    • 基于计量负载的分布式变压器电压的确定
    • US20100179780A1
    • 2010-07-15
    • US12353836
    • 2009-01-14
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • G01R19/00G06F19/00
    • G01R19/2513
    • A method for determining a primary side voltage of a distribution transformer includes determining a first current and a second current flowing through a secondary winding of the transformer at a plurality of time instants based on current meter data generated by a plurality of metered loads. The method may include determining a total current flowing to the plurality of metered loads for each of the plurality of time instants based on the first current and the second current. The method includes receiving a respective meter voltage from each of the plurality of metered loads at each of the plurality of time instants. The method includes determining a secondary side voltage of the transformer at each of the plurality of time instants based on the first, second, and total current and the respective meter voltages. The method includes determining the primary side voltage based on the secondary side voltage.
    • 用于确定配电变压器的初级侧电压的方法包括基于由多个计量负载产生的电流表数据,在多个时刻确定流过变压器次级绕组的第一电流和第二电流。 该方法可以包括基于第一电流和第二电流确定流向多个计时负载的总电流,用于多个时刻中的每一个。 该方法包括在多个时刻的每个时刻从多个测量负载中的每一个接收相应的仪表电压。 该方法包括基于第一,第二和总电流以及相应的仪表电压来确定多个时刻中的每一个处的变压器的次级侧电压。 该方法包括基于次级侧电压来确定初级侧电压。
    • 29. 发明申请
    • DISTRIBUTION SYSTEM ANALYSIS USING METER DATA
    • 使用仪表数据进行分配系统分析
    • US20100179779A1
    • 2010-07-15
    • US12353413
    • 2009-01-14
    • Jeffrey D. Taft
    • Jeffrey D. Taft
    • G01R19/00G01R15/00G06F19/00
    • G01R21/1331G01R19/2513Y02E60/728Y04S10/265
    • A monitoring system includes a first sensor positioned at a first location along a phase conductor line and a second sensor position at a second location along the phase conductor line. The first sensor is configured to generate a first set of synchrophasor data. The second sensor is configured to generate a second set of synchrophasor data. The monitoring system includes a processor configured to receive the first and second sets of synchrophasor data. The processor is further configured to determine a primary side voltage of at least one distribution transformer electrically connected to the phase conductor line based on a secondary side voltage of the at least one distribution transformer. The processor is further configured to determine at least one phase conductor line condition based on the first and second sets of synchrophasor data and the primary side voltage.
    • 监测系统包括位于沿着相导线的第一位置处的第一传感器和沿着相导线的第二位置处的第二传感器位置。 第一传感器被配置为生成第一组同步信息数据。 第二传感器被配置为生成第二组同步信息数据。 监视系统包括被配置为接收第一组和第二组同步信息数据的处理器。 处理器还被配置为基于至少一个配电变压器的次级侧电压来确定电连接到相导线的至少一个配电变压器的初级侧电压。 处理器还被配置为基于第一组和第二组同步信号数据和初级侧电压来确定至少一个相导线条件。