会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 52. 发明授权
    • Management of template versions
    • 管理模板版本
    • US08689176B2
    • 2014-04-01
    • US13105084
    • 2011-05-11
    • Saeed BagheriJarir K. ChaarYi-Min CheeFeng LiuDaniel V. OppenheimKrishna C. Ratakonda
    • Saeed BagheriJarir K. ChaarYi-Min CheeFeng LiuDaniel V. OppenheimKrishna C. Ratakonda
    • G06F9/44
    • G06F17/248G06F17/2288G06Q10/10
    • A computer implemented method, system, and/or computer program product modifies a master template for an executable document. A version architecture comprises a master template for a master document, a new variation document that describes what changes are to be made to the master template for a specific context, and a resulting modified template based on the master template and rule-based instructions found in the new variation document. A processor defines an executable master document from the master template that, when executed, produces a final product. Specific rules set out conditions for modifying the master template for the specific context. These specific rules are used to define a new variation document, which is applied against the master template to generate a context-specific modified template. The context-specific modified template is then used to generate a context-specific executable document that, when executed, generates a final context-specific product.
    • 计算机实现的方法,系统和/或计算机程序产品修改可执行文档的主模板。 版本架构包括主文档的主模板,描述对特定上下文对主模板进行什么更改的新变体文档,以及基于主模板和基于规则的指令的结果修改模板 新的变化文件。 处理器从主模板定义可执行主文档,当执行时,它生成最终产品。 具体规则规定了修改特定上下文的主模板的条件。 这些特定规则用于定义新的变体文档,该文档适用于主模板以生成上下文特定的修改模板。 然后使用上下文特定的修改的模板来生成上下文特定的可执行文档,该文件在执行时生成最终上下文特定的产品。
    • 56. 发明申请
    • OPTIMIZED COLLABORATION BETWEEN DISTRIBUTED CENTERS OF GLOBAL SERVICE DELIVERY SYSTEMS
    • 分布式全球服务提供系统中心之间的优化合作
    • US20120284073A1
    • 2012-11-08
    • US13099504
    • 2011-05-03
    • SHIVALI AGARWALSAEED BAGHERIJARIR K. CHAARKRISHNA C. RATAKONDABIKRAM SENGUPTA
    • SHIVALI AGARWALSAEED BAGHERIJARIR K. CHAARKRISHNA C. RATAKONDABIKRAM SENGUPTA
    • G06Q10/00
    • G06Q10/101
    • A computer implemented method, system, and/or computer program product facilitate optimal collaboration between cells from different service centers for delivering a service to a customer. A cost of collaboration between two cells in different service centers is defined. Each of the two cells is a group of resources capable of executing a same task, and the cost is a 3-Tuple that consists of a monetary cost, a makespan cost, and a skill misalignment cost associated with the collaboration. After establishing acceptable cost ranges for the 3-Tuple based on constraints defined by an enterprise policy, a processor creates multiple collaboration matrices based on different permutations of the 3-Tuple. Once an optimal collaboration function derived from the multiple collaboration matrices is identified, the task is assigned to two optimal cells identified in the optimal collaboration function.
    • 计算机实现的方法,系统和/或计算机程序产品促进来自不同服务中心的小区之间的最佳协作,以将服务递送给客户。 定义不同服务中心的两个单元之间的协作成本。 两个单元中的每一个是能够执行相同任务的一组资源,并且成本是由与合作相关联的货币成本,制造成本和技能失调成本组成的3元组。 在基于企业策略定义的约束条件建立3元组可接受的成本范围之后,处理器基于3元组的不同排列创建多个协作矩阵。 一旦识别出从多个协作矩阵得到的最佳协作功能,则将该任务分配给在最佳协作功能中标识的两个最佳单元。
    • 59. 发明申请
    • PREDICTING FINANCIAL STATUS OF A PROJECT
    • 预测项目财务状况
    • US20120095800A1
    • 2012-04-19
    • US12905469
    • 2010-10-15
    • SAEED BAGHERIDOUGLAS C. BUNCHTHERESA E. ELLKRISHNA C. RATAKONDAKATRINA M. REFFETTROSE M. WILLIAMS
    • SAEED BAGHERIDOUGLAS C. BUNCHTHERESA E. ELLKRISHNA C. RATAKONDAKATRINA M. REFFETTROSE M. WILLIAMS
    • G06Q10/00
    • G06Q10/06313
    • A computer implemented method, system, and/or computer program product predicts the profitability of a current project. Historical data from the current project represents profit data points at predetermined intervals of time during the current project. If a linear regression model of the historical data does not adequately describe the historical data, then a polynomial regression model to describe the historical data is generated. If the polynomial model does not adequately describe the historical data, then another project that is similar to the current project is located. This other project has its own set of historical data. If the historical data from the other project fits the polynomial regression model created from the historical data of the current project, then the polynomial regression model is trusted to accurately predict the profitability of the current project, even though the current project's historical data did not adequately fit the polynomial regression model.
    • 计算机实现的方法,系统和/或计算机程序产品预测了当前项目的盈利能力。 当前项目的历史数据在当前项目中以预定的时间间隔表示利润数据点。 如果历史数据的线性回归模型没有充分描述历史数据,则生成描述历史数据的多项式回归模型。 如果多项式模型没有充分描述历史数据,则定位与当前项目类似的另一个项目。 这个另外一个项目有自己的一套历史数据。 如果其他项目的历史数据符合从当前项目历史数据创建的多项式回归模型,则可信赖多项式回归模型,以准确预测当前项目的盈利能力,即使当前项目的历史数据没有充分 拟合多项式回归模型。