会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 88. 发明授权
    • System aware transmitter adaptation for high speed serial interfaces
    • 适用于高速串行接口的系统感应发射机适配
    • US09313056B1
    • 2016-04-12
    • US14535796
    • 2014-11-07
    • Dell Products, LP
    • Stuart Allen BerkeBhyrav M. Mutnury
    • H04L25/03H04B3/04
    • H04L25/03343H04B3/04H04L1/0033H04L25/0286H04L25/0292H04L25/03878H04L25/03885
    • A high-speed serial interface includes a transmitter having an output module with settings that select an output impedances of the output module and a tuning value for the output impedance, and a receiver having a plurality of compensation modules each to provide a selectable level of equalization to a data bitstream from the transmitter, and a control module that directs the transmitter to successively select each of the tuning values, that directs the compensation modules, for each tuning value, to successively select each of the levels of equalization, that evaluates an indication of a performance level of the receiver for each of the successively selected levels of equalization and for each of the tuning values, and that selects a particular tuning value based upon the indications of the performance level of the receiver.
    • 高速串行接口包括具有输出模块的发射器,输出模块具有选择输出模块的输出阻抗和输出阻抗的调谐值,以及具有多个补偿模块的接收器,每个补偿模块各自提供可选择的均衡电平 涉及来自发射机的数据比特流,以及控制模块,其引导发射机连续选择针对每个调谐值引导补偿模块的每个调谐值,以逐次选择均衡等级的每个,其评估指示 对于每个连续选择的均衡级别和每个调谐值的接收机的性能水平,并且基于接收机的性能水平的指示来选择特定调谐值。
    • 89. 发明授权
    • Date adjusted power budgeting for an information handling system
    • 日期调整功率预算的信息处理系统
    • US09274581B2
    • 2016-03-01
    • US13924988
    • 2013-06-24
    • Dell Products, LP
    • Stuart Allen BerkeJohn E. Jenne
    • G06F1/32
    • G06F1/32
    • An information handling system determines a system configuration including a hardware module, and determines an adjusted power budget for the hardware module. The adjusted power budget is based on a calculation including a difference between a date code read from the hardware module and a baseline date, a baseline power budget, a power reduction period and a power reduction interval. The calculation may optionally include a risk factor. In alternate embodiments, an adjusted power budget for a hardware module may be calculated by an order processing system for information handling systems, or by a planning tool for a data center which contains information handling systems.
    • 信息处理系统确定包括硬件模块的系统配置,并且确定用于硬件模块的经调整的功率预算。 经调整的功率预算基于包括从硬件模块读取的日期代码与基线日期,基准功率预算,功率降低周期和功率降低间隔之间的差异的计算。 计算可以可选地包括风险因素。 在替代实施例中,用于硬件模块的经调整的功率预算可以由信息处理系统的订单处理系统或包含信息处理系统的数据中心的规划工具来计算。